Standup M-Set Blueprint Copy Cost Optimization II
Structure Tech IIMedium Structure Engineering RigsStandup M-Set Blueprint Copy Cost Optimization II — Structure Tech II Structure Engineering Rig M - Blueprint Copy Cost Optimization (Structure Module) — EVE Online item
Market/Structure Modifications/Structure Engineering Rigs/Standup M-Set Blueprint Copy Cost Optimization II
The Standup M-Set Blueprint Copy Cost Optimization II rig provides a means for structure operators to decrease cost requirements when copying in their Upwell structures.
Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Volume
10 m³
Variations(2)
Standup M-Set Blueprint Copy Cost Optimization II
Structure Tech II
Standup M-Set Blueprint Copy Cost Optimization I
Structure Tech I
Recent Destructions
View all →Raitaru· Unknown Pilot · Rayl
4.90bRaitaru· Unknown Pilot · Sukirah
6.95bRaitaru· Unknown Pilot · Riavayed
7.81bRaitaru· Unknown Pilot · 7UTB-F
7.89bRaitaru· Unknown Pilot · 7UTB-F
6.14bRaitaru· Unknown Pilot · N-8YET
5.67bRaitaru· Unknown Pilot · 9GYL-O
6.30bRaitaru· Unknown Pilot · CHP-76
7.37bRaitaru· Unknown Pilot · Elanoda
9.30bRaitaru· Unknown Pilot · Funtanainen
9.62bRequired Skills
Attributes
Structure HP40
Calibration Cost150
Reprocessing Materials
Properties
Type ID43890
Group ID1848
Category ID66
Mass200 kg
Volume10 m³
Portion Size1
Radius100 m
Tech Level2
PublishedYes