Standup M-Set Invention Cost Optimization I

Standup M-Set Invention Cost Optimization I

Structure Tech IMedium Structure Engineering Rigs

Standup M-Set Invention Cost Optimization I — Structure Tech I Structure Engineering Rig M - Invention Cost Optimization (Structure Module) — EVE Online item

Market/Structure Modifications/Structure Engineering Rigs/Standup M-Set Invention Cost Optimization I
The Standup M-Set Invention Cost Optimization I rig provides a means for structure operators to decrease cost requirements when performing invention in their Upwell structures.

Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.

Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Jita Price
130.00m ISK
90d Avg
144.74m ISK
Volume
10
Jita Market (90d)
Latest Price (2026-05-20)
130.00m ISK
90d Average
144.74m ISK
90d High
225.00m ISK
90d Low
100.55m ISK
Avg Daily Volume
1
Variations(2)
Standup M-Set Invention Cost Optimization II
Standup M-Set Invention Cost Optimization II
Structure Tech II
Standup M-Set Invention Cost Optimization I
Standup M-Set Invention Cost Optimization I
Structure Tech I
Required Skills
Attributes
Structure HP40
Calibration Cost100
Properties
Type ID43879
Group ID1842
Category ID66
Mass200 kg
Volume10 m³
Portion Size1
Radius100 m
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-05-20130.00m1
2026-05-11147.00m1
2026-05-09147.00m1
2026-05-06148.90m1
2026-05-04148.90m1
2026-05-03148.00m2
2026-05-02138.45m2
2026-04-30137.00m1
2026-04-27137.00m2
2026-04-25103.70m1
2026-04-24148.00m1
2026-04-21160.80m1
2026-04-20159.00m2
2026-04-18158.00m1
2026-04-12170.00m1
2026-04-11170.00m1
2026-04-05155.00m1
2026-04-04140.40m3
2026-04-03145.00m1
2026-04-01145.00m1
2026-03-29160.97m3
2026-03-25179.90m1
2026-03-24180.00m1
2026-03-23119.00m2
2026-03-18128.00m1
2026-03-17125.00m1
2026-03-07136.00m1
2026-03-06135.00m1
2026-03-05143.00m2
2026-03-03140.00m1