Standup M-Set Invention Cost Optimization II
Structure Tech IIMedium Structure Engineering RigsStandup M-Set Invention Cost Optimization II — Structure Tech II Structure Engineering Rig M - Invention Cost Optimization (Structure Module) — EVE Online item
Market/Structure Modifications/Structure Engineering Rigs/Structure Engineering Rig M - Invention Cost Optimization/Standup M-Set Invention Cost Optimization II
The Standup M-Set Invention Cost Optimization II rig provides a means for structure operators to decrease cost requirements when performing invention in their Upwell structures.
Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Jita Price
744.45m ISK
90d Avg
775.62m ISK
Volume
10 m³
Jita Market (90d)
Latest Price (2026-10-02)
744.45m ISK
90d Average
775.62m ISK
90d High
1.20b ISK
90d Low
600.80m ISK
Avg Daily Volume
1
Variations(2)
Standup M-Set Invention Cost Optimization II
Structure Tech II
Standup M-Set Invention Cost Optimization I
Structure Tech I
Recent Destructions
View all →Raitaru· Unknown Pilot · J123958
4.19bRaitaru· Unknown Pilot · 1A8-6G
4.13bRaitaru· Unknown Pilot · Chibi
3.98bRaitaru· Unknown Pilot · Rayl
3.55bRaitaru· Unknown Pilot · U6D-9A
6.03bRaitaru· Unknown Pilot · J112129
8.72bRaitaru· Unknown Pilot · Pettinck
5.62bRaitaru· Unknown Pilot · Raren
20.02bRaitaru· Unknown Pilot · Jerma
7.22bRaitaru· Unknown Pilot · M5-CGW
8.75bRequired Skills
Attributes
Structure HP40
Calibration Cost150
Reprocessing Materials
Properties
Type ID43878
Category ID66
Mass200 kg
Volume10 m³
Packaged Volume10 m³
Portion Size1
Radius100 m
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-10-02744.45m2
2026-09-23799.70m1
2026-09-19600.80m1
2026-09-13784.45m2
2026-09-12775.00m1
2026-08-15739.95m2
2026-08-14725.00m1
2026-08-07679.90m1
2026-07-231.20b1
2026-07-21709.90m1