Standup M-Set Basic Capital Component Manufacturing Time Efficiency II
Structure Tech IIMedium Structure Engineering RigsStandup M-Set Basic Capital Component Manufacturing Time Efficiency II — Structure Tech II Structure Engineering Rig M - Basic Capital Component TE (Structure Module) — EVE Online item
Market/Structure Modifications/Structure Engineering Rigs/Standup M-Set Basic Capital Component Manufacturing Time Efficiency II
The Standup M-Set Basic Capital Component Manufacturing Time Efficiency II rig provides a means for structure operators to decrease time requirements when manufacturing capital ship construction components in their Upwell structures.
Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Jita Price
1.07b ISK
90d Avg
1.44b ISK
Volume
10 m³
Jita Market (90d)
Latest Price (2026-06-30)
1.07b ISK
90d Average
1.44b ISK
90d High
1.84b ISK
90d Low
1.07b ISK
Avg Daily Volume
1
Variations(2)
Standup M-Set Basic Capital Component Manufacturing Time Efficiency II
Structure Tech II
Standup M-Set Basic Capital Component Manufacturing Time Efficiency I
Structure Tech I
Recent Destructions
View all →Raitaru· Unknown Pilot · Y-XZA7
9.71bRaitaru· Unknown Pilot · LO5-LN
6.63bRaitaru· Unknown Pilot · F-HQWV
5.48bRaitaru· Unknown Pilot · 4LNE-M
5.68bRaitaru· Unknown Pilot · L-SCBU
6.49bRaitaru· Unknown Pilot · Upt
6.47bRaitaru· Unknown Pilot · Q-EHMJ
8.02bRaitaru· Unknown Pilot · Uminas
5.89bRaitaru· Unknown Pilot · J101012
7.90bRaitaru· Unknown Pilot · 1-7B6D
7.12bRequired Skills
Attributes
Structure HP40
Calibration Cost150
Reprocessing Materials
Properties
Type ID43873
Group ID1838
Category ID66
Mass200 kg
Volume10 m³
Portion Size1
Radius100 m
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-06-301.07b1
2026-06-221.22b1
2026-06-171.84b1
2026-06-041.84b1
2026-06-021.20b1
2026-05-291.77b1
2026-05-221.25b1
2026-05-161.80b1
2026-05-131.27b1
2026-05-011.31b1
2026-04-301.30b1
2026-04-231.37b1