Capital Flex Shield Hardener II
Tech IIScriptable Shield HardenersCapital Flex Shield Hardener II — Tech II Flex Shield Hardener (Module) — EVE Online item
Flex Shield Hardeners use powerful but bulky resonance coils to project a constructive interference pattern across a ship's shields. These patterns can increase shield resistances against all damage types, or to provide increased protection against one specific damage type with the aid of swappable scripts.
Note: Only one of this module type can be fitted at a time. May only be fitted to capital ships.
Note: Only one of this module type can be fitted at a time. May only be fitted to capital ships.
Jita Price
57.30m ISK
90d Avg
74.81m ISK
Volume
3,000 m³
Base Price
75.0k ISK
Jita Market (90d)
Latest Price (2026-07-03)
57.30m ISK
90d Average
74.81m ISK
90d High
88.96m ISK
90d Low
36.02m ISK
Avg Daily Volume
5
Variations(5)
Recent Destructions
View all →Phoenix Navy Issue· Athena Blackwell · Shakasi
7.22bAvalanche· Mad Maxa · Uedama
13.11bAvalanche· Guna Deka · Olettiers
1.69bPhoenix Navy Issue· Daxersic Siphon · 6-1T6Z
8.81bAvalanche· lorumerth sunstrider · Jita
3.69bMinokawa· Etsamo Uitra · Avaux
5.91bPhoenix· Stonny Menachis · CT8K-0
4.26bPhoenix Navy Issue· Eva Hekkin · 2ID-87
7.34bPhoenix Navy Issue· Zitronenapokalypse · 9SL-K9
7.63bPhoenix Navy Issue· Flooded · Amamake
9.23bRequired Skills
Attributes
Activation Cost3600.0 GJ
Structure HP40
Powergrid Usage9000 MW
CPU Usage48 tf
Cycle Time60.0s
Charge Size1
Charge Group1,702
Reprocessing Materials
Properties
Type ID41528
Group ID1700
Category ID7
Mass10,000 kg
Volume3,000 m³
Capacity1 m³
Portion Size1
Meta Level5
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-07-0357.30m1
2026-07-0270.96m1
2026-07-0163.50m5
2026-06-3072.02m6
2026-06-2969.87m7
2026-06-2871.03m3
2026-06-2775.30m9
2026-06-2677.55m5
2026-06-2569.31m5
2026-06-2472.36m4
2026-06-2378.70m1
2026-06-2271.47m3
2026-06-2178.76m10
2026-06-2078.76m3
2026-06-1978.83m6
2026-06-1874.18m5
2026-06-1777.68m10
2026-06-1670.02m3
2026-06-1578.66m6
2026-06-1479.49m11
2026-06-1385.06m5
2026-06-1286.28m6
2026-06-1177.97m13
2026-06-1079.26m3
2026-06-0987.79m2
2026-06-0879.78m8
2026-06-0787.65m2
2026-06-0687.97m2
2026-06-0569.68m4
2026-06-0475.82m3