Capital Flex Armor Hardener I
Tech IScriptable Armor HardenersCapital Flex Armor Hardener I — Tech I Flex Armor Hardener (Module) — EVE Online item
Flex Armor Hardeners contain advanced nanite membranes capable of being reprogrammed mid-flight using swappable scripts. When unscripted this module provides resistances to all four damage types, and when loaded with a script it provides greatly enhanced resistance to one specific damage type.
Note: Only one of this module type can be fitted at a time. May only be fitted to capital ships.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
Note: Only one of this module type can be fitted at a time. May only be fitted to capital ships.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
Jita Price
38.99m ISK
90d Avg
38.37m ISK
Volume
4,000 m³
Jita Market (90d)
Latest Price (2026-08-21)
38.99m ISK
90d Average
38.37m ISK
90d High
44.23m ISK
90d Low
30.31m ISK
Avg Daily Volume
2
Variations(4)
Capital Flex Armor Hardener I
Tech I
Capital Flex Armor Hardener II
Tech II
Dark Blood Capital Flex Armor Hardener
Faction
Shadow Serpentis Capital Flex Armor Hardener
Faction
Recent Destructions
View all →Revelation· Yang Xiaolon · WY-9LL
4.50bMoros· Hackman1821 · Q-CAB2
4.69bApostle· MrRokki · Pout
5.28bRevelation· Ray Ayanammi · SR-KBB
2.69bApostle· 2Shae · 6-CZ49
5.64bZirnitra· Frikkoso · EF-F36
6.86bZirnitra· xiyang forever · Atioth
7.62bRevelation· Dread Pilot Robberts · Siseide
5.58bZirnitra· Cyber'sBAck Gogiko · Ham
5.77bErebus· Thomasale · P3X-TN
164.08bRequired Skills
Attributes
Activation Cost3000.0 GJ
Structure HP40
Powergrid Usage10000 MW
CPU Usage30 tf
Cycle Time60.0s
Charge Size1
Charge Group1,701
Reprocessing Materials
Properties
Type ID41515
Group ID1699
Category ID7
Mass1 kg
Volume4,000 m³
Packaged Volume1,000 m³
Capacity1 m³
Portion Size1
Radius10 m
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-08-2138.99m7
2026-08-1741.18m3
2026-08-1541.18m2
2026-08-1441.19m1
2026-08-1341.19m1
2026-08-1238.57m3
2026-08-0141.20m2
2026-07-3141.19m1
2026-07-2841.19m5
2026-07-2641.19m10
2026-07-2333.27m2
2026-07-2238.55m3
2026-07-1835.84m3
2026-07-1633.27m1
2026-07-1435.01m1
2026-07-1342.60m1
2026-07-1135.01m1
2026-07-1035.01m1
2026-07-0935.10m1
2026-07-0642.69m1
2026-07-0540.00m1
2026-06-2842.60m1
2026-06-2742.60m1
2026-06-2044.22m2
2026-06-1731.72m1
2026-06-1331.23m5
2026-06-0430.32m4