Capital Ancillary Shield Booster
CapitalCapital Ancillary Shield Booster — Ancillary Shield Booster (Module) — EVE Online item
Provides a quick boost in shield strength. The module takes Cap Booster charges and will start consuming the ship's capacitor upon the charges running out. Deactivating the module while it has no cap boosters loaded starts reloading, if there are cap boosters available in cargo hold.
Note: Can use Cap Booster 3200 as fuel. Reloading time is 60 seconds. Prototype Inferno Module. May only be fitted to capital class ships.
Note: Can use Cap Booster 3200 as fuel. Reloading time is 60 seconds. Prototype Inferno Module. May only be fitted to capital class ships.
Jita Price
92.95m ISK
90d Avg
96.62m ISK
Volume
4,000 m³
Jita Market (90d)
Latest Price (2026-08-16)
92.95m ISK
90d Average
96.62m ISK
90d High
129.20m ISK
90d Low
10.40m ISK
Avg Daily Volume
12
Variations(2)
Xarasier Capital Ancillary Shield Booster
Storyline
Capital Ancillary Shield Booster
Recent Destructions
View all →Minokawa· Skanilko · B6-XE8
6.54bRorqual· Lisan al-Gaib X · JMH-PT
9.67bRorqual· Paul Atreides X · JMH-PT
8.86bRorqual· Orion Sa-Solo · Amamake
4.56bNaglfar· Joel Hanomaa · J123458
3.67bMinokawa· David Jordan Price · B6-XE8
7.14bPhoenix Navy Issue· frsd · Y8K-5B
11.29bPhoenix Navy Issue· Ice Baked Cider · Asakai
9.18bPhoenix Navy Issue· Ulthaunia · Amamake
8.24bPhoenix· Arc reveange · Amamake
5.41bRequired Skills
Attributes
Activation Cost4000.0 GJ
Structure HP40
Powergrid Usage75000 MW
CPU Usage300 tf
Armor HP Bonus6800.0%
Cycle Time5.0s
Charge Size4
Reprocessing Materials
Properties
Type ID41504
Group ID1156
Category ID7
Volume4,000 m³
Packaged Volume1,000 m³
Capacity900 m³
Portion Size1
Radius500 m
Meta Level1
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-08-1692.95m19
2026-08-1595.18m17
2026-08-1495.44m7
2026-08-1398.97m12
2026-08-1299.57m10
2026-08-11103.10m6
2026-08-1095.65m6
2026-08-09105.10m6
2026-08-08102.97m17
2026-08-07104.20m10
2026-08-06100.96m5
2026-08-0598.06m5
2026-08-04102.41m10
2026-08-03103.65m6
2026-08-0284.33m11
2026-08-01102.17m13
2026-07-31103.60m13
2026-07-30103.68m13
2026-07-29106.00m14
2026-07-2898.63m10
2026-07-27107.28m9
2026-07-26110.12m13
2026-07-25108.35m16
2026-07-24107.15m5
2026-07-23112.88m6
2026-07-22104.99m6
2026-07-21119.06m8
2026-07-20115.51m6
2026-07-19124.60m3
2026-07-18117.75m10