Capital S95a Scoped Remote Shield Booster
Tech ICapitalCapital S95a Scoped Remote Shield Booster — Tech I Remote Shield Booster (Module) — EVE Online item
Transfers shield power over to the target ship, aiding in its defense.
Note: May only be fitted to capital class ships.
Note: May only be fitted to capital class ships.
Jita Price
49.96m ISK
90d Avg
45.08m ISK
Volume
4,000 m³
Base Price
24.66m ISK
Jita Market (90d)
Latest Price (2026-05-24)
49.96m ISK
90d Average
45.08m ISK
90d High
78.86m ISK
90d Low
11.79m ISK
Avg Daily Volume
3
Variations(9)
Capital Remote Shield Booster I
Tech I
Capital Asymmetric Enduring Remote Shield Booster
Tech I
Capital Murky Compact Remote Shield Booster
Tech I
Capital S95a Scoped Remote Shield Booster
Tech I
Capital Remote Shield Booster II
Tech II
CONCORD Capital Remote Shield Booster
Faction
True Sansha Capital Remote Shield Booster
Faction
Dread Guristas Capital Remote Shield Booster
Faction
Domination Capital Remote Shield Booster
Faction
Recent Destructions
View all →Rorqual· Queen Victoria 13th · 5-P1Y2
5.97bMinokawa· Thunder908 Andedare · Y0-BVN
5.42bRorqual· DraconisBeta · T8T-RA
7.05bRorqual· AlibiKruzh plus1second · 15W-GC
7.19bRorqual· Jaames90x · Pakkonen
6.04bNidhoggur· Rufus Bray · M-MD3B
2.73bMinokawa· Airin Distracted · Y4B-BQ
7.59bMinokawa· Kelborhal · 4J-ZC9
8.29bMinokawa· Atapine · YVSL-2
6.45bMinokawa· Timmilina Buelle · YVSL-2
6.36bRequired Skills
Attributes
Activation Cost2400.0 GJ
Structure HP40
Powergrid Usage97500 MW
CPU Usage112 tf
Armor HP Bonus1055.0%
Cycle Time20.0s
Reprocessing Materials
Properties
Type ID41471
Group ID41
Category ID7
Volume4,000 m³
Portion Size1
Meta Level1
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-05-2449.96m1
2026-05-2349.95m1
2026-05-2049.80m2
2026-05-1849.24m3
2026-05-1718.83m2
2026-05-1611.79m1
2026-05-0618.67m2
2026-05-0555.90m2
2026-05-0456.11m4
2026-05-0256.62m1
2026-04-3056.68m1
2026-04-2956.67m1
2026-04-2818.54m1
2026-04-2471.91m1
2026-04-1671.89m2
2026-04-1471.98m2
2026-04-1371.94m6
2026-04-1271.98m3
2026-04-0678.22m1
2026-04-0458.46m6
2026-04-0278.86m1
2026-04-0146.10m8
2026-03-2952.99m4
2026-03-2846.11m5
2026-03-2733.00m2
2026-03-2632.99m1
2026-03-2517.42m2
2026-03-2236.80m2
2026-03-1917.23m3
2026-03-1717.12m3