Federation Navy Warp Scrambler
FactionWarp ScramblersFederation Navy Warp Scrambler — Faction Warp Scrambler (Module) — EVE Online item
Disrupts the target ship's navigation computer, disabling warping, jumping, microwarpdrives and micro jump drives.
Jita Price
113.70m ISK
90d Avg
128.61m ISK
Volume
5 m³
Jita Market (90d)
Latest Price (2026-08-24)
113.70m ISK
90d Average
128.61m ISK
90d High
145.45m ISK
90d Low
92.38m ISK
Avg Daily Volume
4
Variations(15)
Warp Scrambler I
Tech I
J5b Enduring Warp Scrambler
Tech I
Faint Epsilon Scoped Warp Scrambler
Tech I
Initiated Compact Warp Scrambler
Tech I
Warp Scrambler II
Tech II
'Delineative' Warp Scrambler
Storyline
Dark Blood Warp Scrambler
Faction
Domination Warp Scrambler
Faction
Dread Guristas Warp Scrambler
Faction
True Sansha Warp Scrambler
Faction
Shadow Serpentis Warp Scrambler
Faction
Caldari Navy Warp Scrambler
Faction
Republic Fleet Warp Scrambler
Faction
Khanid Navy Warp Scrambler
Faction
Federation Navy Warp Scrambler
Faction
Recent Destructions
View all →Arazu· Tobiazo · J142400
406.14mProteus· Emmtt Hallson · Ladistier
1.16bProteus· Vogel-24 · HB7R-F
669.74mProteus· Vogel-24 · HB7R-F
674.84mProteus· Vogel-24 · BKG-Q2
746.20mTengu· Ilya Alduin · PX-IHN
1.60bProteus· Bashi Belvar · J151141
1.18bGarmur· Killer Rasta · Vlillirier
259.62mProteus· Ruscoe · B6-XE8
920.72mDaredevil· Fenris Colt · Aldranette
297.01mRequired Skills
Attributes
Activation Cost5.0 GJ
Structure HP40
Powergrid Usage1 MW
CPU Usage26 tf
Cycle Time5.0s
Reprocessing Materials
Properties
Type ID41061
Group ID52
Category ID7
Volume5 m³
Packaged Volume5 m³
Portion Size1
Meta Level8
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-08-24113.70m3
2026-08-23101.40m2
2026-08-22111.62m3
2026-08-21138.33m15
2026-08-20130.55m5
2026-08-19138.20m1
2026-08-18125.27m3
2026-08-17138.24m5
2026-08-16122.07m5
2026-08-15138.30m2
2026-08-14138.30m1
2026-08-13128.41m4
2026-08-12137.30m3
2026-08-11127.23m4
2026-08-10129.23m5
2026-08-09121.21m5
2026-08-08125.99m4
2026-08-07130.30m6
2026-08-06137.00m1
2026-08-05136.95m2
2026-08-04137.00m2
2026-08-03137.00m1
2026-08-02111.97m5
2026-08-01138.30m2
2026-07-31138.40m4
2026-07-30132.68m5
2026-07-29116.59m10
2026-07-28134.90m6
2026-07-27122.76m15
2026-07-26121.23m15