Capital Indefatigable Enduring Emergency Hull Energizer
Tech IDamage ControlsCapital Indefatigable Enduring Emergency Hull Energizer — Tech I Damage Control (Module) — EVE Online item
Market/Ship Equipment/Hull & Armor/Damage Control/Capital Indefatigable Enduring Emergency Hull Energizer
Specialized damage control module that utilizes a combination of containment field emitters and electromagnetic molecular hull reinforcers to resist damage to the core structure of your ship. Burns out after a single use.
Note: Only one Damage Control can be fit at a given time. May only be fitted to capital ships.
Note: Only one Damage Control can be fit at a given time. May only be fitted to capital ships.
Jita Price
49.02m ISK
90d Avg
51.62m ISK
Volume
8,000 m³
Jita Market (90d)
Latest Price (2026-10-07)
49.02m ISK
90d Average
51.62m ISK
90d High
59.90m ISK
90d Low
36.35m ISK
Avg Daily Volume
3
Variations(5)
Capital Emergency Hull Energizer I
Tech I
Capital Implacable Compact Emergency Hull Energizer
Tech I
Capital Indefatigable Enduring Emergency Hull Energizer
Tech I
Capital Emergency Hull Energizer II
Tech II
Sisters Capital Emergency Hull Energizer
Faction
Recent Destructions
View all →Naglfar· 1400mm HowitzerArtillery II · Amamake
5.03bNaglfar· Ovitalo Isu · Miyeli
5.12bNaglfar· MrPD · Turnur
3.73bRevelation· Dubceptionz Sasen · Erila
4.84bNaglfar· Nannoken Akova Askiras1 · I30-3A
3.70bRevelation Navy Issue· Roggvir Valekaani · P3EN-E
6.23bRevelation Navy Issue· ILady Bird · P3EN-E
6.22bRevelation Navy Issue· IMaster Chief · P3EN-E
6.22bRevelation Navy Issue· Elomo Hakoke · P3EN-E
5.94bNaglfar· Spool Supremacy · C-N4OD
5.25bRequired Skills
Attributes
Activation Cost8000.0 GJ
Structure HP40
Powergrid Usage100000 MW
CPU Usage80 tf
Cycle Time16.5s
Reprocessing Materials
Properties
Type ID40716
GroupDamage Control (60)
Category ID7
Mass5,000 kg
Volume8,000 m³
Packaged Volume2,000 m³
Portion Size1
Meta Level1
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-10-0749.02m7
2026-09-2958.50m4
2026-09-2836.35m2
2026-09-2736.36m1
2026-09-2157.99m2
2026-09-1557.99m1
2026-09-0958.34m2
2026-08-3158.83m1
2026-08-1559.29m1
2026-08-0541.30m6
2026-07-2537.42m2
2026-07-2259.87m3
2026-07-1359.80m1