Triple Neutron Blaster Cannon I
Tech IExtra LargeTriple Neutron Blaster Cannon I — Tech I Hybrid Weapon (Module) — EVE Online item
Three specialized high angle turrets fitted with neutron blaster cannons are designed for engaging sub-capital threats.
Note: May only be fitted to capital class ships.
Requires hybrid charge types: Antimatter, Iridium, Iron, Lead, Plutonium, Thorium, Tungsten, Uranium.
Note: May only be fitted to capital class ships.
Requires hybrid charge types: Antimatter, Iridium, Iron, Lead, Plutonium, Thorium, Tungsten, Uranium.
Jita Price
80.46m ISK
90d Avg
68.64m ISK
Volume
4,000 m³
Base Price
36.29m ISK
Jita Market (90d)
Latest Price (2026-05-15)
80.46m ISK
90d Average
68.64m ISK
90d High
80.94m ISK
90d Low
45.00m ISK
Avg Daily Volume
7
Variations(7)
Triple Neutron Blaster Cannon I
Tech I
Regulated Compact Triple Neutron Blaster Cannon
Tech I
Modal Enduring Triple Neutron Blaster Cannon
Tech I
Anode Scoped Triple Neutron Blaster Cannon
Tech I
Limited Precise Triple Neutron Blaster Cannon
Tech I
Triple Neutron Blaster Cannon II
Tech II
Shadow Serpentis Triple Neutron Blaster Cannon
Faction
Recent Destructions
View all →Moros Navy Issue· Aiel Bladesire · Amamake
6.13bMoros· Valen Vonkessell · Bosboger
5.93bMoros· Ragnaroc Devany · NHKO-4
5.10bMoros· Elle XL · Miroitem
4.16bMoros· Elle XL · Ignoitton
4.10bMoros· Ghostloket · BWF-ZZ
7.56bMoros· urmomsyina · BWF-ZZ
7.93bMoros· Ghostloket · Oijanen
6.42bMoros· urmomsyina · Oijanen
6.42bMoros· Midys · M-OEE8
9.89bRequired Skills
Attributes
Activation Cost75.0 GJ
Structure HP40
Powergrid Usage99000 MW
CPU Usage95 tf
Charge Size4
Charge Group85
Reprocessing Materials
Properties
Type ID37291
Group ID74
Category ID7
Mass40,000 kg
Volume4,000 m³
Capacity10 m³
Portion Size1
Radius1,000 m
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-05-1580.46m2
2026-05-1380.00m3
2026-05-1245.42m3
2026-05-0980.46m3
2026-05-0880.45m3
2026-05-0280.49m3
2026-04-2780.42m6
2026-04-2645.38m6
2026-04-2580.40m4
2026-04-2480.66m10
2026-04-1145.30m3
2026-04-0780.70m4
2026-04-0580.62m6
2026-04-0380.60m13
2026-04-0280.69m6
2026-03-3080.60m29
2026-03-2974.32m23
2026-03-2845.20m1
2026-03-2771.45m20
2026-03-2668.50m1
2026-03-2545.10m3
2026-03-2345.11m3
2026-03-1245.00m3
2026-03-0170.00m3