Standup Reactor Control Unit I

Standup Reactor Control Unit I

Structure Tech IReactor Control Units

Standup Reactor Control Unit I — Structure Tech I Structure Fitting Module (Structure Module) — EVE Online item

Market/Structure Equipment/Engineering Equipment/Standup Reactor Control Unit I
Standup Reactor Control Unit boosts the usable output of a structure's integrated power core by implementing efficiency programs across the structure's powergrid. Structure operators will see significant increases in the usable powergrid after installing the Reactor Control Unit as module in Upwell technology structures.

Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Jita Price
7.26m ISK
90d Avg
7.73m ISK
Volume
4,000
Jita Market (90d)
Latest Price (2026-05-20)
7.26m ISK
90d Average
7.73m ISK
90d High
11.12m ISK
90d Low
2.76m ISK
Avg Daily Volume
2
Variations(2)
Standup Reactor Control Unit II
Standup Reactor Control Unit II
Structure Tech II
Standup Reactor Control Unit I
Standup Reactor Control Unit I
Structure Tech I
Attributes
Structure HP40
CPU Usage100 tf
Properties
Type ID35965
Group ID1430
Category ID66
Mass500 kg
Volume4,000 m³
Portion Size1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-05-207.26m2
2026-05-1910.00m1
2026-05-189.99m1
2026-05-169.95m2
2026-05-139.95m1
2026-05-114.51m1
2026-05-107.23m2
2026-05-064.51m2
2026-05-049.95m1
2026-05-036.32m3
2026-04-259.95m3
2026-04-187.23m2
2026-04-139.99m1
2026-04-099.99m1
2026-04-089.98m1
2026-04-039.96m3
2026-04-0210.00m1
2026-04-019.54m12
2026-03-299.50m1
2026-03-284.68m1
2026-03-279.44m2
2026-03-243.66m3
2026-03-223.67m6
2026-03-219.99m1
2026-03-165.21m1
2026-03-145.78m3
2026-03-123.71m1
2026-02-282.76m1
2026-02-2411.08m3
2026-02-232.76m1