Standup Energy Neutralization Burst Projector
Structure Tech IStructure Burst ProjectorsStandup Energy Neutralization Burst Projector — Structure Tech I Structure Burst Projector (Structure Module) — EVE Online item
Emits an area-of-effect burst centered on the designated location. The burst neutralizes a portion of the energy in affected ships' capacitor. Only one module of this type can be fit per structure.
Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Jita Price
137.45m ISK
90d Avg
188.89m ISK
Volume
4,000 m³
Jita Market (90d)
Latest Price (2026-08-16)
137.45m ISK
90d Average
188.89m ISK
90d High
698.60m ISK
90d Low
130.10m ISK
Avg Daily Volume
4
Recent Destructions
View all →Fortizar· Unknown Pilot · J161411
15.95bFortizar· Unknown Pilot · 4-M1TY
15.68bTatara· Unknown Pilot · PE-SAM
46.32bFortizar· Unknown Pilot · AK-L0Z
20.70bSotiyo· Unknown Pilot · TAL1-3
75.91bAzbel· Unknown Pilot · 7F-2FB
10.24bKeepstar· Unknown Pilot · 1A8-6G
341.64bFortizar· Unknown Pilot · BEG-RL
16.08bFortizar· Unknown Pilot · J-0KB3
22.62bFortizar· Unknown Pilot · 7F-2FB
20.85bAttributes
Activation Cost19000.0 GJ
Structure HP40
Powergrid Usage200000 MW
CPU Usage3000 tf
Cycle Time90.0s
Reprocessing Materials
Properties
Type ID35944
Group ID1331
Category ID66
Mass500 kg
Volume4,000 m³
Packaged Volume4,000 m³
Portion Size1
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-08-16137.45m2
2026-08-15143.65m2
2026-08-14150.65m2
2026-08-12151.00m1
2026-08-11148.23m3
2026-08-10146.00m2
2026-08-09156.44m7
2026-08-08159.40m1
2026-08-07156.67m3
2026-08-06146.90m2
2026-08-05167.70m1
2026-08-04168.40m1
2026-08-02152.75m2
2026-07-31160.16m10
2026-07-30171.30m1
2026-07-29151.15m2
2026-07-28169.50m2
2026-07-27172.80m1
2026-07-26174.40m1
2026-07-25176.80m1
2026-07-24177.00m1
2026-07-23177.08m6
2026-07-22178.50m1
2026-07-21178.85m2
2026-07-20167.90m2
2026-07-19168.10m4
2026-07-18163.75m2
2026-07-17192.07m4
2026-07-16187.74m8
2026-07-15195.67m7