Standup Energy Neutralization Burst Projector
Structure Tech IStructure Burst ProjectorsStandup Energy Neutralization Burst Projector — Structure Tech I Structure Burst Projector (Structure Module) — EVE Online item
Emits an area-of-effect burst centered on the designated location. The burst neutralizes a portion of the energy in affected ships' capacitor. Only one module of this type can be fit per structure.
Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Jita Price
179.65m ISK
90d Avg
168.16m ISK
Volume
4,000 m³
Jita Market (90d)
Latest Price (2026-05-18)
179.65m ISK
90d Average
168.16m ISK
90d High
191.00m ISK
90d Low
129.10m ISK
Avg Daily Volume
3
Recent Destructions
View all →Astrahus· Unknown Pilot · 39-DGG
2.99bFortizar· Unknown Pilot · Fasse
39.27bAstrahus· Unknown Pilot · Huola
4.19bFortizar· Unknown Pilot · Otsela
17.79bFortizar· Unknown Pilot · Atlulle
44.98bFortizar· Unknown Pilot · HO4E-Q
27.74bTatara· Unknown Pilot · J220924
24.05bFortizar· Unknown Pilot · J164732
20.63bAstrahus· Unknown Pilot · JPEZ-R
2.57bAstrahus· Unknown Pilot · M5NO-B
2.64bAttributes
Activation Cost19000.0 GJ
Structure HP40
Powergrid Usage200000 MW
CPU Usage3000 tf
Cycle Time90.0s
Reprocessing Materials
Properties
Type ID35944
Group ID1331
Category ID66
Mass500 kg
Volume4,000 m³
Portion Size1
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-05-18179.65m4
2026-05-17178.29m10
2026-05-16167.53m4
2026-05-15178.80m2
2026-05-14151.03m3
2026-05-13171.64m5
2026-05-12171.78m4
2026-05-11179.36m8
2026-05-10157.30m4
2026-05-09174.75m6
2026-05-08180.90m1
2026-05-07142.00m2
2026-05-06181.20m1
2026-05-05160.77m6
2026-05-03152.80m1
2026-05-01183.70m1
2026-04-30183.30m1
2026-04-29183.22m4
2026-04-28182.90m2
2026-04-27168.83m3
2026-04-26183.20m1
2026-04-25183.20m1
2026-04-24169.43m3
2026-04-23184.10m3
2026-04-22184.50m3
2026-04-21165.87m3
2026-04-20185.00m3
2026-04-19185.39m8
2026-04-18185.15m2
2026-04-17185.60m2