Standup Point Defense Battery I

Standup Point Defense Battery I

Structure Tech IPoint Defense Batteries

Standup Point Defense Battery I — Structure Tech I Structure Area Denial Module (Structure Module) — EVE Online item

Market/Structure Equipment/Engineering Equipment/Standup Point Defense Battery I
The Standup Point Defense Battery is a system designed to provide close point defense capability to space structures, providing area denial as required by structure operators. The Point Defense Battery is designed as an integrated PDC network and can be installed as a module in Upwell technology structures.

Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.

This module does not function in high-security space.
Jita Price
133.80m ISK
90d Avg
153.00m ISK
Volume
8,000
Jita Market (90d)
Latest Price (2026-07-06)
133.80m ISK
90d Average
153.00m ISK
90d High
195.95m ISK
90d Low
112.10m ISK
Avg Daily Volume
3
Variations(2)
Standup Point Defense Battery II
Standup Point Defense Battery II
Structure Tech II
Standup Point Defense Battery I
Standup Point Defense Battery I
Structure Tech I
Attributes
Activation Cost1500.0 GJ
Structure HP40
Powergrid Usage150000 MW
CPU Usage1000 tf
Cycle Time12.0s
Charge Size3
Charge Group4,186
Properties
Type ID35926
Group ID1330
Category ID66
Mass1,000 kg
Volume8,000 m³
Capacity600 m³
Portion Size1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-07-06133.80m1
2026-07-05134.05m2
2026-07-04174.90m5
2026-07-02157.90m1
2026-07-01127.47m4
2026-06-30178.10m2
2026-06-28174.95m2
2026-06-27124.50m5
2026-06-25174.60m2
2026-06-24173.10m1
2026-06-22179.85m2
2026-06-20142.88m5
2026-06-18189.95m2
2026-06-17166.97m3
2026-06-15158.41m10
2026-06-14174.80m1
2026-06-13184.00m1
2026-06-12183.90m1
2026-06-10158.50m2
2026-06-09189.00m1
2026-06-08158.10m2
2026-06-06190.00m1
2026-06-05156.97m4
2026-06-04167.97m3
2026-06-03189.60m1
2026-06-02145.13m4
2026-06-01192.95m2
2026-05-28194.93m4
2026-05-27190.63m3
2026-05-24195.60m1