Standup Research Lab I

Standup Research Lab I

Structure Tech IEngineering Service Modules

Standup Research Lab I — Structure Tech I Structure Engineering Service Module (Structure Module) — EVE Online item

The Standup Research Lab I is a service module that allows Research activity when installed into an Upwell technology structure.

While an Upwell Structure has at least one service module online, it will enter "full power" mode and gain significantly increased shield and armor hitpoints and an extra reinforcement cycle.

Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Jita Price
162.80m ISK
90d Avg
173.75m ISK
Volume
4,000
Jita Market (90d)
Latest Price (2026-08-16)
162.80m ISK
90d Average
173.75m ISK
90d High
248.70m ISK
90d Low
130.30m ISK
Avg Daily Volume
3
Attributes
Powergrid Usage30000 MW
CPU Usage600 tf
Properties
Type ID35891
Group ID1415
Category ID66
Mass500 kg
Volume4,000 m³
Packaged Volume4,000 m³
Portion Size1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-08-16162.80m1
2026-08-15200.10m2
2026-08-14238.70m1
2026-08-12245.90m1
2026-08-11204.70m2
2026-08-10248.35m2
2026-08-09248.53m3
2026-08-07229.35m2
2026-08-05195.82m4
2026-08-04191.80m2
2026-08-03184.93m3
2026-08-02168.13m3
2026-08-01189.60m3
2026-07-31189.45m2
2026-07-30189.80m1
2026-07-29152.70m1
2026-07-28175.80m2
2026-07-26175.93m3
2026-07-25176.88m4
2026-07-24174.75m2
2026-07-23174.80m1
2026-07-21174.90m2
2026-07-19174.90m1
2026-07-18174.60m4
2026-07-17174.40m2
2026-07-16159.20m3
2026-07-15170.12m5
2026-07-14174.60m1
2026-07-13169.57m3
2026-07-12169.20m3