Standup Invention Lab I
Structure Tech IEngineering Service ModulesStandup Invention Lab I — Structure Tech I Structure Engineering Service Module (Structure Module) — EVE Online item
The Standup Invention Lab I is a service module that allows Invention activity when installed into an Upwell technology structure.
While an Upwell Structure has at least one service module online, it will enter "full power" mode and gain significantly increased shield and armor hitpoints and an extra reinforcement cycle.
Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
While an Upwell Structure has at least one service module online, it will enter "full power" mode and gain significantly increased shield and armor hitpoints and an extra reinforcement cycle.
Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.
Jita Price
184.55m ISK
90d Avg
166.24m ISK
Volume
4,000 m³
Jita Market (90d)
Latest Price (2026-05-17)
184.55m ISK
90d Average
166.24m ISK
90d High
262.50m ISK
90d Low
119.05m ISK
Avg Daily Volume
4
Attributes
Powergrid Usage30000 MW
CPU Usage700 tf
Reprocessing Materials
Properties
Type ID35886
Group ID1415
Category ID66
Mass500 kg
Volume4,000 m³
Portion Size1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-05-17184.55m2
2026-05-15160.00m3
2026-05-14188.30m1
2026-05-13188.30m1
2026-05-12177.45m4
2026-05-11159.70m4
2026-05-10163.82m4
2026-05-09160.12m5
2026-05-08167.23m3
2026-05-07157.65m6
2026-05-06170.00m1
2026-05-05163.68m4
2026-05-04169.90m1
2026-05-03163.80m4
2026-05-02164.11m7
2026-05-01165.20m2
2026-04-29166.15m2
2026-04-28166.20m1
2026-04-27165.85m2
2026-04-26159.72m4
2026-04-24159.97m4
2026-04-23166.10m3
2026-04-22158.53m3
2026-04-21166.95m6
2026-04-20155.07m4
2026-04-19163.52m5
2026-04-18169.20m1
2026-04-17154.77m3
2026-04-16156.83m3
2026-04-15186.50m1