CONCORD Dual Giga Beam Laser
FactionExtra LargeCONCORD Dual Giga Beam Laser — Faction Energy Weapon (Module) — EVE Online item
One of the largest weapons currently in existence, this massive laser is designed for extended sieges of stationary installations and other large targets.
Note: May only be fitted to capital class ships.
Requires either regular or advanced frequency crystal ammo types: Gamma, Infrared, Microwave, Multifrequency, Radio, Standard, Ultraviolet, Xray, Aurora, Gleam.
Note: May only be fitted to capital class ships.
Requires either regular or advanced frequency crystal ammo types: Gamma, Infrared, Microwave, Multifrequency, Radio, Standard, Ultraviolet, Xray, Aurora, Gleam.
Jita Price
519.10m ISK
90d Avg
465.89m ISK
Volume
4,000 m³
Jita Market (90d)
Latest Price (2026-08-25)
519.10m ISK
90d Average
465.89m ISK
90d High
528.90m ISK
90d Low
245.00m ISK
Avg Daily Volume
8
Variations(9)
Dual Giga Beam Laser I
Tech I
Modulated Compact Dual Giga Beam Laser
Tech I
Modal Enduring Dual Giga Beam Laser
Tech I
Anode Scoped Dual Giga Beam Laser
Tech I
Afocal Precise Dual Giga Beam Laser
Tech I
Dual Giga Beam Laser II
Tech II
CONCORD Dual Giga Beam Laser
Faction
Dark Blood Dual Giga Beam Laser
Faction
True Sansha Dual Giga Beam Laser
Faction
Recent Destructions
View all →Avatar· Nuclear Viking · Q-GICU
171.08bAvatar· Martje · Itrin
183.45bAvatar· Jaroslav · Akkio
205.47bAvatar· glie Ernaga · M9-LAN
172.14bAvatar· orange shadow · Atioth
185.10bAvatar· JD Chase · Atioth
181.41bAvatar· SumTingWongWitBridge · Atioth
187.38bAvatar· Sanctificate Mortis · Atioth
189.55bAvatar· Mendeli Vium · Atioth
191.54bAvatar· Zeon Finance · N-RAEL
169.60bRequired Skills
Attributes
Activation Cost468.0 GJ
Structure HP40
Powergrid Usage168750 MW
CPU Usage80 tf
Charge Size4
Charge Group86
Reprocessing Materials
Properties
Type ID3561
Group ID53
Category ID7
Mass40,000 kg
Volume4,000 m³
Packaged Volume1,000 m³
Capacity1 m³
Portion Size1
Meta Level8
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-08-25519.10m1
2026-08-24519.70m6
2026-08-22520.70m7
2026-08-20522.10m1
2026-08-19463.15m15
2026-08-18527.95m6
2026-08-17527.61m12
2026-08-16525.33m12
2026-08-13491.57m6
2026-08-12469.85m6
2026-08-11494.00m1
2026-08-09357.20m6
2026-08-08528.77m6
2026-08-06528.88m12
2026-08-05508.13m12
2026-08-04470.18m12
2026-08-03414.81m18
2026-08-02405.95m11
2026-08-01449.70m6
2026-07-30469.25m6
2026-07-29469.33m6
2026-07-27470.27m6
2026-07-24400.20m2
2026-07-23468.48m6
2026-07-22467.88m6
2026-07-19400.00m2
2026-07-17431.00m20
2026-07-16458.97m12
2026-07-15458.07m6
2026-07-10461.32m6