Harvester Mining Drone
FactionHarvester Mining Drone — Faction Mining Drone (Drone) — EVE Online item
Once the most efficient mining drone money can buy, the Harvester Mining Drone failed to keep up with continued innovation in the years after its introduction. Over time this once prestigious piece of mining equipment fell into disuse.
A revitalization project initiated in YC 118 updated the venerable Harvester designs with the latest in mining drone technology. Initially sold to empire-based mining operations across the cluster, blueprints eventually ended up in the hands of capsuleers and pirates through the usual bloody avenues.
A revitalization project initiated in YC 118 updated the venerable Harvester designs with the latest in mining drone technology. Initially sold to empire-based mining operations across the cluster, blueprints eventually ended up in the hands of capsuleers and pirates through the usual bloody avenues.
Jita Price
505.81m ISK
90d Avg
405.63m ISK
Volume
10 m³
Jita Market (90d)
Latest Price (2026-07-06)
505.81m ISK
90d Average
405.63m ISK
90d High
525.00m ISK
90d Low
300.10m ISK
Avg Daily Volume
6
Variations(6)
Recent Destructions
View all →Hulk· Lardrug · Balle
2.68bOrca· Fades R Us · D-GTMI
3.62bMackinaw· Medea Caan · Adacyne
2.21bMackinaw· Zombee66 · Ahbazon
989.64mOrca· Roninninja · Ihakana
3.54bOrca· XUNUMBU · Jita
3.69bOrca· Tyler Durdin · Cistuvaert
4.43bHulk· Slinky Minx · Kubinen
1.79bLif· ipscomb · J133906
6.83bPerseverance· Bad Bunny II · Tolle
1.17bRequired Skills
Attributes
Structure HP70
Max Velocity350 m/s
Capacitor Recharge2500.0s
Cycle Time60.0s
Ladar Strength42
Max Locked Targets8
Shield HP70
Armor HP50
Shield Recharge Time200.0s
Capacitor Capacity1.0 GJ
Signature Radius25 m
Reprocessing Materials
Properties
Type ID3218
Group ID101
Category ID18
Volume10 m³
Portion Size1
Radius5 m
Meta Level7
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-07-06505.81m7
2026-07-05503.80m2
2026-07-04436.47m10
2026-07-03524.82m10
2026-07-02524.70m1
2026-06-30418.74m20
2026-06-29410.53m3
2026-06-27400.90m1
2026-06-26411.30m1
2026-06-24335.58m5
2026-06-23411.90m5
2026-06-20395.84m5
2026-06-19390.02m4
2026-06-18389.97m3
2026-06-17369.80m7
2026-06-16390.02m5
2026-06-14397.10m5
2026-06-13355.70m2
2026-06-12386.87m10
2026-06-11397.12m5
2026-06-10375.18m4
2026-06-09396.20m5
2026-06-08326.58m5
2026-06-07348.42m12
2026-06-06395.00m6
2026-06-05404.78m5
2026-06-04399.77m8
2026-06-03386.14m14
2026-06-01378.02m5
2026-05-31394.32m17