Small Projectile Locus Coordinator I
Tech ISmall Projectile Weapon RigsSmall Projectile Locus Coordinator I — Tech I Rig Projectile Weapon (Module) — EVE Online item
Market/Ship and Module Modifications/Rigs/Projectile Weapon Rigs/Small Projectile Locus Coordinator I
This ship modification is designed to increase the optimal range of all projectile turrets at the expense of increased power grid need for projectile weapons.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Projectile Weapon Rigging skill.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Projectile Weapon Rigging skill.
Jita Price
23.1k ISK
90d Avg
22.5k ISK
Volume
5 m³
Jita Market (90d)
Latest Price (2026-08-28)
23.1k ISK
90d Average
22.5k ISK
90d High
27.1k ISK
90d Low
20 ISK
Avg Daily Volume
21
Variations(2)
Small Projectile Locus Coordinator I
Tech I
Small Projectile Locus Coordinator II
Tech II
Recent Destructions
View all →Thrasher· THE SPACE APE · Resbroko
3.22mThrasher· Aphoxema G · Amarr
8.07mThrasher· THE SPACE APE · Resbroko
2.81mRifter· afr4y · Jita
3.98mThrasher· Aphoxema G · Amarr
8.05mRifter· THE SPACE APE · Resbroko
2.04mThrasher· Aphoxema G · Amarr
8.04mRifter· Tomo Denim · Ihakana
3.74mThrasher Fleet Issue· Werrygg · Vard
29.25mRifter· saltba3 · Lisudeh
7.90mAttributes
Structure HP40
Calibration Cost100
Reprocessing Materials
Properties
Type ID31692
Group ID777
Category ID7
Mass200 kg
Volume5 m³
Packaged Volume5 m³
Portion Size1
Radius100 m
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-08-2823.1k4
2026-08-2723.2k202
2026-08-2623.2k2
2026-08-2523.3k1
2026-08-2423.3k7
2026-08-2321.6k80
2026-08-2222.6k3
2026-08-2121.0k10
2026-08-2023.4k28
2026-08-1923.4k3
2026-08-1823.4k156
2026-08-1723.4k5
2026-08-1623.5k61
2026-08-1523.5k4
2026-08-1423.5k5
2026-08-132.7k56
2026-08-1282275
2026-08-1118.1k13
2026-08-0923.6k4
2026-08-0823.6k57
2026-08-0723.6k101
2026-08-0623.6k2
2026-08-0523.6k1
2026-08-0423.6k2
2026-08-0323.6k27
2026-08-0123.7k264
2026-07-3123.7k60
2026-07-3023.7k1
2026-07-2923.7k1
2026-07-2812.0k4