Capital Particle Dispersion Projector I
Tech ICapital Electronics Superiority RigsCapital Particle Dispersion Projector I — Tech I Rig Electronic Systems (Module) — EVE Online item
Market/Ship and Module Modifications/Rigs/Electronics Superiority Rigs/Capital Particle Dispersion Projector I
This ship modification is designed to increase the optimal range of a ship's ECM, remote sensor dampeners, weapon disruptors and target painters at the expense of shields.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Electronic Superiority Rigging skill.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Electronic Superiority Rigging skill.
Jita Price
119.53m ISK
90d Avg
174.90m ISK
Volume
40 m³
Jita Market (90d)
Latest Price (2026-05-20)
119.53m ISK
90d Average
174.90m ISK
90d High
222.20m ISK
90d Low
164.0k ISK
Avg Daily Volume
3
Variations(2)
Capital Particle Dispersion Projector I
Tech I
Capital Particle Dispersion Projector II
Tech II
Recent Destructions
View all →Phoenix Navy Issue· Segon Utama · IOO-7O
6.08bPhoenix Navy Issue· Sticker Nalliery · Turnur
7.87bPhoenix Navy Issue· Garveen Airuta · M-MD31
6.80bPhoenix Navy Issue· Sulinder · DAI-SH
6.12bPhoenix Navy Issue· Killer Nomad nikkin · D-I9HJ
5.25bPhoenix Navy Issue· hisison · 1I5-0V
3.70bNidhoggur· Marcus Orez · SUR-F7
4.88bPhoenix Navy Issue· Sticker Nalliery · Akkio
6.91bPhoenix Navy Issue· Liam Reppola · Bordan
8.94bPhoenix Navy Issue· Razeleao · J121006
9.33bAttributes
Structure HP40
Calibration Cost100
Reprocessing Materials
Properties
Type ID31302
Group ID786
Category ID7
Mass200 kg
Volume40 m³
Portion Size1
Radius100 m
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-05-20119.53m3
2026-05-05119.80m1
2026-04-28218.33m3
2026-04-27216.88m13
2026-04-24219.70m3
2026-04-23219.10m6
2026-04-15222.20m1
2026-04-09221.77m3
2026-04-05222.10m1
2026-04-04222.00m1
2026-04-01222.00m3
2026-03-28214.63m3
2026-03-27210.10m1
2026-03-26210.00m1
2026-03-22142.40m1
2026-03-2187.43m3
2026-03-1960.00m1
2026-02-28164.0k2