Capital Nanobot Accelerator I
Tech ICapital Armor RigsCapital Nanobot Accelerator I — Tech I Rig Armor (Module) — EVE Online item
This ship modification is designed to reduce a ship's armor repair cycle duration at the expense of increased power grid need for them.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Armor Rigging skill.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Armor Rigging skill.
Jita Price
45.22m ISK
90d Avg
44.38m ISK
Volume
40 m³
Jita Market (90d)
Latest Price (2026-05-17)
45.22m ISK
90d Average
44.38m ISK
90d High
45.84m ISK
90d Low
29.42m ISK
Avg Daily Volume
3
Variations(2)
Capital Nanobot Accelerator I
Tech I
Capital Nanobot Accelerator II
Tech II
Recent Destructions
View all →Thanatos· stilet kda · Ohkunen
5.05bMoros Navy Issue· Telios Voss · Amamake
7.02bMoros Navy Issue· Cercis InoAtari · Siseide
6.51bThanatos· Stolas ZuKrayn · OSY-UD
3.68bZirnitra· Lord Shevan · J123432
10.45bRevelation· E delusion1 · C-HCGU
4.55bZirnitra· superkings 232 · A1RR-M
7.08bApostle· Dwall Kappa · T8T-RA
6.33bApostle· Nick TNT · T8T-RA
6.01bMoros· Totally not Batman · Turnur
2.62bAttributes
Structure HP40
Calibration Cost100
Reprocessing Materials
Properties
Type ID31067
Group ID773
Category ID7
Mass200 kg
Volume40 m³
Portion Size1
Radius100 m
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-05-1745.22m2
2026-05-1645.32m1
2026-05-1532.04m1
2026-05-1442.06m4
2026-05-1245.70m2
2026-05-1145.73m1
2026-05-1038.63m2
2026-05-0945.75m1
2026-05-0845.78m1
2026-05-0745.81m1
2026-05-0645.81m2
2026-05-0542.23m4
2026-05-0345.83m3
2026-05-0242.22m8
2026-04-3045.53m7
2026-04-2844.75m1
2026-04-2744.75m3
2026-04-2644.75m8
2026-04-2544.70m1
2026-04-2444.70m2
2026-04-2344.75m3
2026-04-2144.85m5
2026-04-2045.29m2
2026-04-1945.72m1
2026-04-1845.06m5
2026-04-1745.78m4
2026-04-1645.78m2
2026-04-1531.06m1
2026-04-1445.82m6
2026-04-1345.20m5