Capital Nanobot Accelerator II
Tech IICapital Armor RigsCapital Nanobot Accelerator II — Tech II Rig Armor (Module) — EVE Online item
This ship modification is designed to reduce a ship's armor repair cycle duration at the expense of increased power grid need for them.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Armor Rigging skill.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Armor Rigging skill.
Jita Price
569.70m ISK
90d Avg
543.90m ISK
Volume
40 m³
Jita Market (90d)
Latest Price (2026-08-22)
569.70m ISK
90d Average
543.90m ISK
90d High
749.30m ISK
90d Low
238.35m ISK
Avg Daily Volume
1
Variations(2)
Capital Nanobot Accelerator I
Tech I
Capital Nanobot Accelerator II
Tech II
Recent Destructions
View all →Revelation Navy Issue· Ares Tzestu · VKI-T7
8.99bRevelation Navy Issue· Cheng · VKI-T7
8.68bApostle· Klyria · J131505
8.67bMoros Navy Issue· Dominator Marshall · Oulley
13.66bBane· Ares Tzestu · XHQ-7V
18.40bRevelation Navy Issue· Cheng · XHQ-7V
9.18bMoros Navy Issue· Senju Tobirama · Sadana
8.96bMoros Navy Issue· Andrei Uta · 1I5-0V
9.59bRevelation Navy Issue· Honiara · CT8K-0
8.65bMoros Navy Issue· Hyrum Shakor · Amamake
12.09bAttributes
Structure HP40
Calibration Cost150
Reprocessing Materials
Properties
Type ID27066
Group ID773
Category ID7
Mass200 kg
Volume40 m³
Packaged Volume40 m³
Portion Size1
Radius100 m
Meta Level5
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-08-22569.70m1
2026-08-20575.90m1
2026-08-18578.90m1
2026-08-17580.70m1
2026-08-15588.30m1
2026-08-09597.80m1
2026-08-08373.87m7
2026-08-07359.35m4
2026-07-26632.10m1
2026-07-25632.10m1
2026-07-20633.00m1
2026-07-18636.40m1
2026-07-17638.80m1
2026-07-14642.90m1
2026-07-11646.50m1
2026-07-06685.30m1
2026-06-26748.90m1
2026-06-24749.10m1
2026-06-21740.57m3
2026-06-19749.30m1
2026-06-13420.00m2
2026-06-11409.20m1
2026-06-10409.15m2
2026-06-07408.90m1
2026-06-05408.90m1
2026-06-04408.90m1
2026-06-03408.80m1
2026-06-02408.90m1
2026-05-31408.90m1
2026-05-29401.10m1