Capital Nanobot Accelerator I
Tech ICapital Armor RigsCapital Nanobot Accelerator I — Tech I Rig Armor (Module) — EVE Online item
This ship modification is designed to reduce a ship's armor repair cycle duration at the expense of increased power grid need for them.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Armor Rigging skill.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Armor Rigging skill.
Jita Price
46.05m ISK
90d Avg
51.53m ISK
Volume
40 m³
Jita Market (90d)
Latest Price (2026-10-01)
46.05m ISK
90d Average
51.53m ISK
90d High
97.56m ISK
90d Low
33.06m ISK
Avg Daily Volume
4
Variations(2)
Capital Nanobot Accelerator I
Tech I
Capital Nanobot Accelerator II
Tech II
Recent Destructions
View all →Revelation· Dark Shines · C-N4OD
5.20bApostle· Zubrilka Aivoras · E-WMT7
5.49bApostle· Grumpy Siberian · E-WMT7
4.92bZirnitra· detective spider · J7YR-1
5.04bZirnitra· kele34 · J7YR-1
6.28bMoros Navy Issue· Andrejs L · Alparena
6.87bApostle· Runirtus · F-5WYK
6.13bNinazu· Nastrahaa Russells · Raa
6.84bNinazu· Sotibra · V2-GZS
8.29bMoros· Schadeck · Ahbazon
4.28bAttributes
Structure HP40
Calibration Cost100
Reprocessing Materials
Properties
Type ID31067
GroupRig Armor (773)
Category ID7
Mass200 kg
Volume40 m³
Packaged Volume40 m³
Portion Size1
Radius100 m
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-10-0146.05m3
2026-09-3046.11m4
2026-09-2846.20m4
2026-09-2746.23m4
2026-09-2646.29m2
2026-09-2546.29m1
2026-09-2445.15m3
2026-09-2341.00m1
2026-09-2241.00m3
2026-09-2140.99m4
2026-09-2040.99m1
2026-09-1940.91m6
2026-09-1740.95m1
2026-09-1640.96m8
2026-09-1540.97m4
2026-09-1442.81m3
2026-09-1342.84m10
2026-09-1242.87m3
2026-09-1037.97m2
2026-09-0942.88m5
2026-09-0844.84m3
2026-09-0742.38m4
2026-09-0646.27m3
2026-09-0541.71m5
2026-09-0446.31m1
2026-09-0346.44m1
2026-09-0243.66m4
2026-09-0146.97m11
2026-08-3146.51m2
2026-08-3047.13m2