Batch Compressed Spodumain III-Grade
SpodumainBatch Compressed Spodumain III-Grade — Spodumain (Asteroid) — EVE Online item
Once in a while, III-Grade spodumain is found with crystalline veins running through it. The 10% increased value this yields puts a gleam in the eye of any miner lucky enough to find it.
Spodumain is amongst the most desirable ore types around, as it contains high volumes of the most heavily demanded resource and some amounts of the more precious minerals. Huge volumes of Tritanium and moderate amounts of Isogen, Nocxium, Zydrine and Megacyte can be obtained by refining these rocks.
This material was compressed using an older process that compressed batches of raw materials into units using a set input quantity. Newer compression technology uses a more flexible one-to-one unit compression system.
Spodumain is amongst the most desirable ore types around, as it contains high volumes of the most heavily demanded resource and some amounts of the more precious minerals. Huge volumes of Tritanium and moderate amounts of Isogen, Nocxium, Zydrine and Megacyte can be obtained by refining these rocks.
This material was compressed using an older process that compressed batches of raw materials into units using a set input quantity. Newer compression technology uses a more flexible one-to-one unit compression system.
Jita Price
1.65m ISK
90d Avg
592.9k ISK
Volume
28 m³
Base Price
6.32m ISK
Jita Market (90d)
Latest Price (2026-10-02)
1.65m ISK
90d Average
592.9k ISK
90d High
1.65m ISK
90d Low
17.0k ISK
Avg Daily Volume
265
Required Skills
Reprocessing Materials
Properties
Type ID28419
GroupSpodumain (461)
Category ID25
Mass100,000,000,000,000,000,000,000,000,000,000,000 kg
Volume28 m³
Packaged Volume28 m³
Portion Size1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-10-021.65m376
2026-07-26599.4k589
2026-07-24599.4k42
2026-07-2117.0k111
2026-07-20599.5k64
2026-07-19332.5k258
2026-07-18332.5k100
2026-07-15599.4k665
2026-07-13599.4k447
2026-07-10599.7k1