Large Energy Metastasis Adjuster II
Tech IILarge Energy Weapon RigsLarge Energy Metastasis Adjuster II — Tech II Rig Energy Weapon (Module) — EVE Online item
This ship modification is designed to increase the tracking speed of a ship's energy turrets at the expense of increased power grid need for them.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Energy Weapon Rigging skill.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Energy Weapon Rigging skill.
Jita Price
7.75m ISK
90d Avg
4.08m ISK
Volume
20 m³
Jita Market (90d)
Latest Price (2026-10-01)
7.75m ISK
90d Average
4.08m ISK
90d High
13.10m ISK
90d Low
9.0k ISK
Avg Daily Volume
3
Variations(2)
Large Energy Metastasis Adjuster I
Tech I
Large Energy Metastasis Adjuster II
Tech II
Recent Destructions
View all →Paladin· Vyacheslav Nikolaev · I0AB-R
4.00bApocalypse· jjbest2 · ZD1-Z2
369.59mPaladin· Kuta Buguse · J170231
2.06bApocalypse· Maezer Rackham · K-3PQW
269.79mApocalypse Navy Issue· Caharin Rahll · J132754
1.83bAbaddon· Takuya Gogiko · UCG4-B
296.95mPaladin· Hiroshima Bob · RNF-YH
1.68bPaladin· Therma Mayaki · Inaya
1.71bNightmare· DonKerrigan · P3EN-E
1.47bPaladin· Wattt Tottt · J135807
1.15bAttributes
Structure HP40
Calibration Cost150
Reprocessing Materials
Properties
Type ID26390
Category ID7
Mass200 kg
Volume20 m³
Packaged Volume20 m³
Portion Size1
Radius100 m
Meta Level5
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-10-017.75m1
2026-09-307.75m2
2026-09-297.75m10
2026-09-287.78m3
2026-09-267.84m2
2026-09-257.85m3
2026-09-247.36m5
2026-09-229.47m3
2026-09-2011.62m8
2026-09-1813.10m3
2026-09-155.00m2
2026-09-133.93m5
2026-09-123.45m4
2026-09-113.45m1
2026-09-103.45m2
2026-09-083.45m5
2026-09-073.45m4
2026-09-053.45m3
2026-09-043.45m1
2026-09-033.25m3
2026-09-022.97m1
2026-09-012.97m1
2026-08-302.71m6
2026-08-292.49m4
2026-08-282.49m1
2026-08-262.49m2
2026-08-222.50m1
2026-08-212.91m6
2026-08-202.91m1
2026-08-192.91m21