Large Energy Metastasis Adjuster I
Tech ILarge Energy Weapon RigsLarge Energy Metastasis Adjuster I — Tech I Rig Energy Weapon (Module) — EVE Online item
This ship modification is designed to increase the tracking speed of a ship's energy turrets at the expense of increased power grid need for them.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Energy Weapon Rigging skill.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
The drawbacks of fitting this rig may be reduced by training the Energy Weapon Rigging skill.
Jita Price
1.77m ISK
90d Avg
3.14m ISK
Volume
20 m³
Jita Market (90d)
Latest Price (2026-08-16)
1.77m ISK
90d Average
3.14m ISK
90d High
3.86m ISK
90d Low
1.50m ISK
Avg Daily Volume
5
Variations(2)
Large Energy Metastasis Adjuster I
Tech I
Large Energy Metastasis Adjuster II
Tech II
Recent Destructions
View all →Apocalypse· Tank CEO · Asakai
255.59mApocalypse Navy Issue· Amorth · E2-RDQ
526.14mPraxis· tnyee2006 · New Caldari
235.36mApocalypse· Old Tekisen · J142117
206.19mPaladin· Nshan Antonyan · B-7DFU
4.17bApocalypse· xKARAKURTx · BKG-Q2
264.02mArmageddon Navy Issue· Hara Canard · T-LIWS
464.04mApocalypse· Big Sperg · Aldranette
285.29mTempest· Crockett IATS · Aldranette
245.70mPaladin· Hiroshima Bob · C-J6MT
2.08bAttributes
Structure HP40
Calibration Cost100
Reprocessing Materials
Properties
Type ID25974
Group ID775
Category ID7
Mass200 kg
Volume20 m³
Packaged Volume20 m³
Portion Size1
Radius100 m
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-08-161.77m1
2026-08-141.67m5
2026-08-131.55m2
2026-08-121.57m3
2026-08-101.74m2
2026-08-061.99m6
2026-08-042.00m1
2026-07-312.00m4
2026-07-302.00m2
2026-07-292.00m1
2026-07-282.00m1
2026-07-272.67m3
2026-07-262.68m1
2026-07-252.68m1
2026-07-242.68m1
2026-07-232.69m1
2026-07-202.80m1
2026-07-192.87m3
2026-07-183.08m5
2026-07-163.15m2
2026-07-153.16m1
2026-07-143.17m1
2026-07-133.17m4
2026-07-123.17m22
2026-07-113.18m7
2026-07-091.50m1
2026-07-083.19m2
2026-07-063.20m2
2026-07-043.35m5
2026-07-033.37m1