'Gauntlet' Small Focused Beam Laser I
StorylineSmall'Gauntlet' Small Focused Beam Laser I — Storyline Energy Weapon (Module) — EVE Online item
A high-powered beam laser. Good for medium range encounters.
Requires frequency crystal ammo types: Gamma, Infrared, Microwave, Multifrequency, Radio, Standard, Ultraviolet, Xray.
Requires frequency crystal ammo types: Gamma, Infrared, Microwave, Multifrequency, Radio, Standard, Ultraviolet, Xray.
Jita Price
28.74m ISK
90d Avg
12.09m ISK
Volume
5 m³
Jita Market (90d)
Latest Price (2026-10-02)
28.74m ISK
90d Average
12.09m ISK
90d High
29.99m ISK
90d Low
2.51m ISK
Avg Daily Volume
5
Variations(11)
Small Focused Beam Laser I
Tech I
Small Focused Modal Laser I
Tech I
Small Focused Afocal Laser I
Tech I
Small Focused Modulated Energy Beam I
Tech I
Small Focused Anode Particle Stream I
Tech I
Small Focused Beam Laser II
Tech II
'Gauntlet' Small Focused Beam Laser I
Storyline
Dark Blood Small Focused Beam Laser
Faction
True Sansha Small Focused Beam Laser
Faction
Ammatar Navy Small Focused Beam Laser
Faction
Imperial Navy Small Focused Beam Laser
Faction
Recent Destructions
View all →Dragoon Navy Issue· overlord030201 · AD010
141.34mVexor Navy Issue· KAzmierzDE · Covryn
73.44mPunisher· Kar'Ta Fenture'Aguess · AD120
52.71mRetribution· Wagner311 · AD066
99.19mImperial Navy Slicer· Shu Hua · Nagamanen
53.50mSuccubus· dsmay · Dodixie
221.92mDragoon· Augustus1 · Gaha
36.93mConfessor· Philip 'Baerd' Orwell · Rancer
339.12mImperial Navy Slicer· Mr Psychoactif · AD130
43.60mImperial Navy Slicer· Nakamoto Sempai · HM-UVD
91.70mRequired Skills
Attributes
Activation Cost9.0 GJ
Structure HP40
Powergrid Usage10 MW
CPU Usage14 tf
Charge Size1
Charge Group86
Reprocessing Materials
Properties
Type ID23838
GroupEnergy Weapon (53)
Category ID7
Mass500 kg
Volume5 m³
Packaged Volume5 m³
Capacity1 m³
Portion Size1
Meta Level6
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-10-0228.74m4
2026-09-2325.00m3
2026-09-2111.20m12
2026-09-1511.58m8
2026-08-3011.58m3
2026-08-2911.24m7
2026-08-262.51m6
2026-08-2511.00m2
2026-08-2011.55m8
2026-08-1011.55m5
2026-08-0811.55m1
2026-08-0611.55m8
2026-08-027.60m6
2026-07-286.80m7
2026-07-262.51m3
2026-07-2511.70m2
2026-07-2011.94m1
2026-07-1912.00m1
2026-07-1714.55m2
2026-07-1314.88m2
2026-07-1212.50m8
2026-07-1112.50m1