'Investor' Tracking Disruptor I
StorylineWeapon Disruptors'Investor' Tracking Disruptor I — Storyline Weapon Disruptor (Module) — EVE Online item
Disrupts the turret range and tracking speed of the target ship. This module can be loaded with scripts to increase its effectiveness in certain areas.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
Jita Price
63.39m ISK
90d Avg
68.25m ISK
Volume
5 m³
Base Price
29.8k ISK
Jita Market (90d)
Latest Price (2026-08-16)
63.39m ISK
90d Average
68.25m ISK
90d High
124.95m ISK
90d Low
16.88m ISK
Avg Daily Volume
4
Variations(6)
Recent Destructions
View all →Breacher· seba380 · Kurniainen
612.51mBreacher· Amarr QueenP · Kourmonen
777.40mBreacher· Amarr QueenP · Oyonata
724.44mSentinel· Rossarii · P7-45V
768.58mGriffin Navy Issue· Murray II Rotineque · Siseide
331.66mGarmur· Zevi Marque · Amamake
367.47mCurse· Lapras Ortik · X-HISR
2.19bGarmur· Zevi Marque · Auga
375.92mGolem· BKWI · Niyabainen
3.99bSentinel· Baltrom · Dal
460.09mRequired Skills
Attributes
Activation Cost10.0 GJ
Structure HP40
Powergrid Usage1 MW
CPU Usage25 tf
Cycle Time10.0s
Charge Size1
Charge Group909
Reprocessing Materials
Properties
Type ID22933
Group ID291
Category ID7
Volume5 m³
Packaged Volume5 m³
Capacity1 m³
Portion Size1
Meta Level6
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-08-1663.39m1
2026-08-1563.25m1
2026-08-1499.28m4
2026-08-1399.36m4
2026-08-1199.99m1
2026-08-0880.25m18
2026-08-0766.08m4
2026-08-0664.51m3
2026-08-0470.48m3
2026-08-0370.48m4
2026-08-0260.57m9
2026-08-0153.01m1
2026-07-3168.00m1
2026-07-3066.62m3
2026-07-2966.58m2
2026-07-2766.58m2
2026-07-2660.53m3
2026-07-2565.19m7
2026-07-2466.56m1
2026-07-2362.86m3
2026-07-2166.50m1
2026-07-1966.60m1
2026-07-1866.15m6
2026-07-1667.22m8
2026-07-1561.00m1
2026-07-1457.52m1
2026-07-1360.23m5
2026-07-1171.29m6
2026-07-0964.94m2
2026-07-0859.01m10