Mining Foreman Link - Laser Optimization I

Mining Foreman Link - Laser Optimization I

Tech I

Mining Foreman Link - Laser Optimization I — Tech I Gang Coordinator (Module) — EVE Online item

Market/Mining Foreman Link - Laser Optimization I
Decreases mining laser, gas harvester and ice harvester duration.

Foreman Links are dedicated mining operation systems designed to assist foremen in coordinating their operations.

While only one of these units can normally be operated at any given time, certain advanced units allow the use of multiple systems.

Note: The Fleet bonus only works if you are the assigned fleet booster.
Volume
60
Variations(2)
Mining Foreman Link - Laser Optimization I
Mining Foreman Link - Laser Optimization I
Tech I
Mining Foreman Link - Laser Optimization II
Mining Foreman Link - Laser Optimization II
Tech II
Required Skills
Attributes
Activation Cost25.0 GJ
Structure HP40
Powergrid Usage100 MW
CPU Usage50 tf
Cycle Time10.0s
Properties
Type ID22557
Group ID316
Category ID7
Volume60 m³
Portion Size1
Tech Level1
PublishedYes