'Inception' Target Painter
StorylineTarget Painters'Inception' Target Painter — Storyline Target Painter (Module) — EVE Online item
A targeting subsystem that projects an electronic "Tag" on the target thus making it easier to target and hit.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
Penalty: Using more than one type of this module or similar modules that affect the same attribute on the ship will be penalized.
Jita Price
26.65m ISK
90d Avg
24.45m ISK
Volume
5 m³
Jita Market (90d)
Latest Price (2026-10-06)
26.65m ISK
90d Average
24.45m ISK
90d High
34.59m ISK
90d Low
19.73m ISK
Avg Daily Volume
6
Variations(9)
Target Painter I
Tech I
Peripheral Compact Target Painter
Tech I
Parallel Enduring Target Painter
Tech I
Phased Scoped Target Painter
Tech I
Target Painter II
Tech II
'Inception' Target Painter
Storyline
Republic Fleet Target Painter
Faction
Domination Target Painter
Faction
Tisiphone's Modified Target Painter
Officer
Recent Destructions
View all →Rattlesnake· Flloxon · LE-67X
1.96bRaven Navy Issue· Sanya ruffian · Ignoitton
617.75mLoki· III LLIATYH III · Rafeme
736.40mPurifier· csst4k · Iesa
98.46mGarmur· Shitsen Naari · Isenairos
104.79mMagus· Low Rida · EU-WFW
129.46mGarmur· Anton Maverick · A9D-R0
463.25mSacrilege· Lulili · BUZ-DB
427.48mPraxis· EVIL REAVER · J230905
569.75mHuginn· CAT0 SAY0NARA · Amoen
530.27mRequired Skills
Attributes
Activation Cost4.0 GJ
Structure HP40
Powergrid Usage1 MW
CPU Usage14 tf
Cycle Time5.0s
Signature Radius Modifier30.0%
Reprocessing Materials
Properties
Type ID21540
GroupTarget Painter (379)
Category ID7
Volume5 m³
Packaged Volume5 m³
Portion Size1
Radius500 m
Meta Level6
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-10-0626.65m8
2026-10-0525.60m14
2026-10-0424.68m17
2026-10-0326.27m8
2026-10-0227.45m6
2026-10-0128.43m11
2026-09-3022.84m24
2026-09-2928.63m1
2026-09-2825.13m9
2026-09-2731.21m2
2026-09-2627.71m10
2026-09-2534.10m1
2026-09-2428.02m2
2026-09-2328.72m3
2026-09-2224.48m6
2026-09-2125.02m8
2026-09-2023.70m6
2026-09-1923.13m2
2026-09-1824.63m10
2026-09-1725.03m11
2026-09-1625.02m2
2026-09-1523.59m6
2026-09-1422.77m9
2026-09-1222.13m22
2026-09-1123.74m6
2026-09-1024.58m8
2026-09-0925.09m4
2026-09-0824.97m3
2026-09-0724.18m5
2026-09-0621.26m11