Medium Railgun Battery
Tech IHybrid BatteriesMedium Railgun Battery — Tech I Mobile Hybrid Sentry (Starbase) — EVE Online item
Fires a barrage of large hybrid slugs at those the Control Tower deems its enemies. Provides high damage output and is effective at long ranges.
Jita Price
5.09m ISK
90d Avg
4.26m ISK
Volume
1,000 m³
Base Price
2.50m ISK
Jita Market (90d)
Latest Price (2026-10-11)
5.09m ISK
90d Average
4.26m ISK
90d High
6.61m ISK
90d Low
10.0k ISK
Avg Daily Volume
7
Variations(3)
Medium Railgun Battery
Tech I
Serpentis Medium Railgun Battery
Faction
Shadow Medium Railgun Battery
Faction
Recent Destructions
View all →Medium Railgun Battery· Unknown Pilot · J103217
5.76mMedium Railgun Battery· Unknown Pilot · J103217
5.76mMedium Railgun Battery· Unknown Pilot · J103217
5.76mMedium Railgun Battery· Unknown Pilot · J103217
5.76mMedium Railgun Battery· Unknown Pilot · 0FG-KS
5.78mMedium Railgun Battery· Unknown Pilot · 0FG-KS
5.78mMedium Railgun Battery· Unknown Pilot · 0FG-KS
5.78mMedium Railgun Battery· Unknown Pilot · 0FG-KS
5.78mMedium Railgun Battery· Unknown Pilot · 0FG-KS
5.78mMedium Railgun Battery· Unknown Pilot · 0FG-KS
5.78mRequired Skills
Attributes
Structure HP100,000
Powergrid Usage180000 MW
Radar Strength500,000
Charge Size3
Max Locked Targets1
Shield HP50,000
Armor HP750,000
Shield Recharge Time5000.0s
Signature Radius12000 m
Max Target Range75 m
Charge Group85
Reprocessing Materials
Properties
Type ID16691
Category ID23
Mass100,000,000 kg
Volume1,000 m³
Packaged Volume1,000 m³
Capacity160 m³
Portion Size1
Radius400 m
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-10-115.09m3
2026-10-045.09m5
2026-10-031.15m4
2026-10-023.12m6
2026-09-285.75m1
2026-09-2650.3k2
2026-09-245.76m1
2026-09-2350.2k2
2026-09-225.76m4
2026-09-195.78m32
2026-09-185.78m2
2026-09-175.78m1
2026-09-165.77m40
2026-09-155.77m3
2026-09-135.77m2
2026-09-125.78m2
2026-09-115.78m5
2026-09-0810.0k4
2026-09-075.79m2
2026-09-065.80m2
2026-08-306.00m2
2026-08-246.60m10
2026-08-216.59m30
2026-08-176.61m1
2026-08-1510.0k2
2026-08-124.85m8
2026-08-104.89m1
2026-08-033.00m5
2026-07-301.27m8
2026-07-273.40m8