Caldari Control Tower
Tech IControl TowersCaldari Control Tower — Tech I Control Tower (Starbase) — EVE Online item
At first the Caldari Control Towers were manufactured by Kaalakiota, but since they focused their efforts mostly on other, more profitable installations, they soon lost the contract and the Sukuuvestaa corporation took over the Control Towers' development and production.
Racial Bonuses:
25% bonus to Missile Battery Rate of Fire
50% bonus to Missile Velocity
-75% bonus to ECM Jammer Battery Target Cycling Speed
Racial Bonuses:
25% bonus to Missile Battery Rate of Fire
50% bonus to Missile Velocity
-75% bonus to ECM Jammer Battery Target Cycling Speed
Jita Price
445.50m ISK
90d Avg
449.05m ISK
Volume
8,000 m³
Base Price
400.00m ISK
Jita Market (90d)
Latest Price (2026-07-03)
445.50m ISK
90d Average
449.05m ISK
90d High
515.00m ISK
90d Low
360.10m ISK
Avg Daily Volume
2
Variations(3)
Recent Destructions
View all →Caldari Control Tower· Unknown Pilot · Ohmahailen
445.43mCaldari Control Tower· Unknown Pilot · Dudreda
436.10mCaldari Control Tower· Unknown Pilot · Isikano
436.10mCaldari Control Tower· Unknown Pilot · Manjonakko
436.10mCaldari Control Tower· Unknown Pilot · Manjonakko
436.10mCaldari Control Tower· Unknown Pilot · Isikano
436.10mCaldari Control Tower· Unknown Pilot · Vuorrassi
447.50mCaldari Control Tower· Unknown Pilot · Frulegur
447.50mCaldari Control Tower· Unknown Pilot · Frulegur
447.50mCaldari Control Tower· Unknown Pilot · Arvasaras
443.80mAttributes
Structure HP4,000,000
Powergrid Output2750000 MW
CPU Output7500 tf
Radar Strength500,000
Shield HP50,000,000
Armor HP4,000,000
Shield EM Resist0.0%
Shield Thermal Resist0.0%
Shield Kinetic Resist25.0%
Shield Explosive Resist50.0%
Shield Recharge Time200000.0s
Signature Radius32000 m
Reprocessing Materials
Properties
Type ID16213
Group ID365
Category ID23
Mass200,000,000 kg
Volume8,000 m³
Capacity140,000 m³
Portion Size1
Radius3,275 m
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-07-03445.50m1
2026-07-02445.43m4
2026-07-01445.80m1
2026-06-30445.70m2
2026-06-28436.10m2
2026-06-27447.30m3
2026-06-26447.50m1
2026-06-24443.80m2
2026-06-23447.90m1
2026-06-22448.50m3
2026-06-21449.00m1
2026-06-20436.95m2
2026-06-18452.00m1
2026-06-17453.20m1
2026-06-16454.63m3
2026-06-15425.03m3
2026-06-12457.10m1
2026-06-10459.20m6
2026-06-09360.15m4
2026-06-08459.55m2
2026-06-07390.10m3
2026-06-06447.38m8
2026-06-02462.10m2
2026-05-31457.13m4
2026-05-30463.20m3
2026-05-29463.30m1
2026-05-28463.64m5
2026-05-27430.10m1
2026-05-26390.20m1
2026-05-24427.40m2