Dark Blood Medium Energy Neutralizer
FactionMediumDark Blood Medium Energy Neutralizer — Faction Energy Neutralizer (Module) — EVE Online item
Market/Ship Equipment/Engineering Equipment/Energy Neutralizers/Dark Blood Medium Energy Neutralizer
Neutralizes a portion of the energy in the target ship's capacitor.
Jita Price
62.92m ISK
90d Avg
69.29m ISK
Volume
5 m³
Jita Market (90d)
Latest Price (2026-08-26)
62.92m ISK
90d Average
69.29m ISK
90d High
83.92m ISK
90d Low
60.35m ISK
Avg Daily Volume
8
Variations(13)
Medium Energy Neutralizer I
Tech I
Medium Gremlin Compact Energy Neutralizer
Tech I
Medium Infectious Scoped Energy Neutralizer
Tech I
Medium Energy Neutralizer II
Tech II
Medium 'Ditch' Energy Neutralizer
Storyline
Dark Blood Medium Energy Neutralizer
Faction
True Sansha Medium Energy Neutralizer
Faction
Ammatar Navy Medium Energy Neutralizer
Faction
Imperial Navy Medium Energy Neutralizer
Faction
Ryhad's Modified Medium Energy Neutralizer
Officer
Corpum C-Type Medium Energy Neutralizer
Deadspace
Corpum B-Type Medium Energy Neutralizer
Deadspace
Corpum A-Type Medium Energy Neutralizer
Deadspace
Recent Destructions
View all →Vargur· RocketJack · J211151
2.05bCurse· Equinox Daedalus · XHQ-7V
384.27mOdysseus· Walla alex · Ami
3.43bLegion· Swans · L-Z9KJ
892.03mVargur· Phoenix Bain · Hagilur
1.56bLegion· Tyrus Mortellus · Aimoguier
830.46mOdysseus· Malakye Appleton · Juunigaishi
4.14bIkitursa· Kelsey Auditore · Ardar
1.71bVedmak· Jennifer Jovakko · Eugales
501.54mVedmak· Jennifer Jovakko · Heydieles
645.33mRequired Skills
Attributes
Activation Cost150.0 GJ
Structure HP40
Powergrid Usage175 MW
CPU Usage20 tf
Cycle Time12.0s
Reprocessing Materials
Properties
Type ID14164
Group ID71
Category ID7
Mass2,000 kg
Volume5 m³
Packaged Volume5 m³
Portion Size1
Meta Level8
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-08-2662.92m3
2026-08-2562.63m4
2026-08-2478.14m9
2026-08-2365.78m9
2026-08-2274.52m3
2026-08-2180.25m10
2026-08-2079.26m7
2026-08-1972.94m8
2026-08-1868.17m7
2026-08-1767.58m12
2026-08-1664.48m12
2026-08-1565.88m7
2026-08-1468.00m25
2026-08-1364.05m11
2026-08-1270.19m7
2026-08-1162.34m9
2026-08-1070.43m15
2026-08-0976.54m14
2026-08-0875.76m15
2026-08-0776.30m9
2026-08-0662.60m21
2026-08-0577.02m12
2026-08-0472.49m8
2026-08-0374.25m12
2026-08-0273.12m13
2026-08-0170.44m5
2026-07-3176.36m4
2026-07-3060.66m4
2026-07-2972.12m9
2026-07-2872.12m3