Dread Guristas 150mm Railgun
FactionSmallDread Guristas 150mm Railgun — Faction Hybrid Weapon (Module) — EVE Online item
This is a standard long-range railgun designed for frigates. Railguns use magnetic rails to fire solid chunks of matter at hypersonic speed. The accurate range of railguns is very good, but due to technical limitations it cannot use onboard guidance. This results in a fairly rapid drop in accuracy at extreme ranges.
Requires hybrid charge types: Antimatter, Iridium, Iron, Lead, Plutonium, Thorium, Tungsten, Uranium.
Requires hybrid charge types: Antimatter, Iridium, Iron, Lead, Plutonium, Thorium, Tungsten, Uranium.
Jita Price
5.19m ISK
90d Avg
6.77m ISK
Volume
5 m³
Base Price
7.5k ISK
Jita Market (90d)
Latest Price (2026-10-11)
5.19m ISK
90d Average
6.77m ISK
90d High
16.36m ISK
90d Low
3.89m ISK
Avg Daily Volume
3
Variations(11)
150mm Railgun I
Tech I
150mm Prototype Gauss Gun
Tech I
150mm 'Scout' Accelerator Cannon
Tech I
150mm Carbide Railgun I
Tech I
150mm Compressed Coil Gun I
Tech I
150mm Railgun II
Tech II
150mm 'Musket' Railgun
Storyline
Shadow Serpentis 150mm Railgun
Faction
Dread Guristas 150mm Railgun
Faction
Caldari Navy 150mm Railgun
Faction
Federation Navy 150mm Railgun
Faction
Recent Destructions
View all →Hecate· cursedlion · Amamake
106.32mKeres· Yukii Osaka · J160941
169.32mPurifier· brooklyn west · Ignoitton
909.21mAlgos Navy Issue· Ngok · Iidoken
156.16mIshkur· ClimaxChild raygu · H-HWQR
352.37mIshkur· Flower Fallen · Hallanen
545.00mHecate· Fawst · Dodixie
500.31mLachesis· Visio's Girl Cloud · YKSC-A
1.05bRaptor· dent kr · Nagamanen
92.36mAlgos· Nesen Mika · Arnon
40.90mRequired Skills
Attributes
Activation Cost1.9 GJ
Structure HP40
Powergrid Usage8 MW
CPU Usage27 tf
Charge Size1
Charge Group85
Reprocessing Materials
Properties
Type ID13867
GroupHybrid Weapon (74)
Category ID7
Mass500 kg
Volume5 m³
Packaged Volume5 m³
Capacity0.1 m³
Portion Size1
Radius10 m
Meta Level8
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-10-115.19m2
2026-10-1012.24m5
2026-10-085.19m1
2026-10-0711.14m6
2026-10-0610.94m8
2026-10-035.17m3
2026-10-029.54m6
2026-10-015.17m5
2026-09-305.17m1
2026-09-285.17m2
2026-09-275.16m2
2026-09-269.15m6
2026-09-215.16m2
2026-09-205.15m1
2026-09-175.15m2
2026-09-135.14m1
2026-09-125.14m3
2026-09-115.14m2
2026-09-105.14m1
2026-09-014.25m1
2026-08-3013.87m5
2026-08-2813.88m9
2026-08-253.89m1
2026-08-2211.74m11
2026-08-205.56m4
2026-08-175.75m1
2026-08-155.75m1
2026-08-149.60m1
2026-08-115.75m1
2026-08-105.75m8