Shadow Serpentis 150mm Railgun
FactionSmallShadow Serpentis 150mm Railgun — Faction Hybrid Weapon (Module) — EVE Online item
This is a standard long-range railgun designed for frigates. Railguns use magnetic rails to fire solid chunks of matter at hypersonic speed. The accurate range of railguns is very good, but due to technical limitations it cannot use onboard guidance. This results in a fairly rapid drop in accuracy at extreme ranges.
Requires hybrid charge types: Antimatter, Iridium, Iron, Lead, Plutonium, Thorium, Tungsten, Uranium.
Requires hybrid charge types: Antimatter, Iridium, Iron, Lead, Plutonium, Thorium, Tungsten, Uranium.
Jita Price
650.0k ISK
90d Avg
3.42m ISK
Volume
5 m³
Base Price
7.5k ISK
Jita Market (90d)
Latest Price (2026-05-21)
650.0k ISK
90d Average
3.42m ISK
90d High
7.09m ISK
90d Low
570.0k ISK
Avg Daily Volume
6
Variations(11)
150mm Railgun I
Tech I
150mm Prototype Gauss Gun
Tech I
150mm 'Scout' Accelerator Cannon
Tech I
150mm Carbide Railgun I
Tech I
150mm Compressed Coil Gun I
Tech I
150mm Railgun II
Tech II
150mm 'Musket' Railgun
Storyline
Shadow Serpentis 150mm Railgun
Faction
Dread Guristas 150mm Railgun
Faction
Caldari Navy 150mm Railgun
Faction
Federation Navy 150mm Railgun
Faction
Recent Destructions
View all →Federation Navy Comet· nekozuki Futa · Auga
21.48mFederation Navy Comet· nekozuki Futa · Vard
23.20mCormorant Navy Issue· DoboeZlo · Ignoitton
117.38mCormorant· Isharimo Kalkoken · Uchomida
57.19mEnyo· Sasha Dyer · Ingunn
45.42mIncursus· Jacob Manley · Kiskoken
22.76mIncursus· Techtel · Kiskoken
14.10mCormorant· Sara Kho · Semiki
18.35mMerlin· Sara Kho · Antiainen
13.08mHeron· Plotnikdim · Otsela
18.29mRequired Skills
Attributes
Activation Cost1.9 GJ
Structure HP40
Powergrid Usage10 MW
CPU Usage27 tf
Charge Size1
Charge Group85
Reprocessing Materials
Properties
Type ID13866
Group ID74
Category ID7
Mass500 kg
Volume5 m³
Capacity0.1 m³
Portion Size1
Radius10 m
Meta Level8
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-05-21650.0k8
2026-05-202.84m15
2026-05-19627.9k1
2026-05-17585.2k8
2026-05-163.26m14
2026-05-132.50m1
2026-05-113.77m3
2026-05-103.17m13
2026-05-093.03m5
2026-05-083.03m7
2026-05-073.03m2
2026-05-054.43m6
2026-05-043.03m4
2026-05-033.03m2
2026-05-023.80m20
2026-05-013.90m18
2026-04-304.90m11
2026-04-293.02m4
2026-04-283.03m5
2026-04-273.02m2
2026-04-263.57m11
2026-04-253.02m1
2026-04-244.40m13
2026-04-234.25m6
2026-04-205.49m2
2026-04-194.55m17
2026-04-183.02m4
2026-04-174.96m13
2026-04-163.02m1
2026-04-153.01m7