Moreau’s Modified Expanded Scan Probe Launcher
OfficerScan Probe LaunchersMoreau’s Modified Expanded Scan Probe Launcher — Officer Scan Probe Launcher (Module) — EVE Online item
Market/Ship Equipment/Scanning Equipment/Scan Probe Launcher/Moreau’s Modified Expanded Scan Probe Launcher
Launcher for Core Scanner Probes and Combat Scanner Probes.
Core Scanner Probes are used to scan down Cosmic Signatures in space.
Combat Scanner Probes are used to scan down Cosmic Signatures, starships, structures and drones.
Note: Only one scan probe launcher can be fitted per ship.
15% bonus to strength of scan probes.
Core Scanner Probes are used to scan down Cosmic Signatures in space.
Combat Scanner Probes are used to scan down Cosmic Signatures, starships, structures and drones.
Note: Only one scan probe launcher can be fitted per ship.
15% bonus to strength of scan probes.
Jita Price
264.73m ISK
90d Avg
296.63m ISK
Volume
5 m³
Jita Market (90d)
Latest Price (2026-10-01)
264.73m ISK
90d Average
296.63m ISK
90d High
363.20m ISK
90d Low
189.30m ISK
Avg Daily Volume
17
Variations(4)
Expanded Probe Launcher I
Tech I
Expanded Probe Launcher II
Tech II
Sisters Expanded Probe Launcher
Faction
Moreau’s Modified Expanded Scan Probe Launcher
Officer
Recent Destructions
View all →Buzzard· Ana torre · J112028
1.74bAnathema· Justa Valhalla · Utopia
645.14mTengu· Black Salami · Deltole
1.70bAnathema· Vark Kubanoid · J142653
533.19mPacifier· Aashai Modor · J122213
1.78bPacifier· LiquidSmoke78 · F5M-CC
1.28bBuzzard· Fart Queen · J113158
871.32mPacifier· Andre Skywalker · Timudan
1.03bLoki· VivaLeroSh · Hadozeko
1.62bPacifier· qiuxiaoye · TYB-69
1.03bRequired Skills
Attributes
Structure HP40
Powergrid Usage1 MW
CPU Usage220 tf
Cycle Time10.0s
Charge Group479
Reprocessing Materials
Properties
Type ID92453
Category ID7
Volume5 m³
Packaged Volume5 m³
Capacity8 m³
Portion Size1
Meta Level6
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-10-01264.73m23
2026-09-30268.88m15
2026-09-29288.54m8
2026-09-28262.43m19
2026-09-27272.97m27
2026-09-26295.83m11
2026-09-25284.73m8
2026-09-24280.61m13
2026-09-23271.11m17
2026-09-22215.73m35
2026-09-21217.28m19
2026-09-20209.56m17
2026-09-19234.19m24
2026-09-18244.52m22
2026-09-17262.35m4
2026-09-16271.79m15
2026-09-15272.19m48
2026-09-14289.31m20
2026-09-13280.89m20
2026-09-12284.72m25
2026-09-11284.90m9
2026-09-10282.39m11
2026-09-09291.09m12
2026-09-08281.62m20
2026-09-07279.56m25
2026-09-06292.41m17
2026-09-05292.04m7
2026-09-04294.64m16
2026-09-03301.71m13
2026-09-02294.06m12