Glorified Unstable Heavy Energy Nosferatu Mutaplasmid

Glorified Unstable Heavy Energy Nosferatu Mutaplasmid

AbyssalLarge Engineering Mutaplasmids

Glorified Unstable Heavy Energy Nosferatu Mutaplasmid — Abyssal Mutaplasmids (Commodity) — EVE Online item

Market/Ship and Module Modifications/Mutaplasmids/Engineering Mutaplasmids/Glorified Unstable Heavy Energy Nosferatu Mutaplasmid
This bioadaptive mutaplasmid tool is designed to interface with and alter energy charge leeching devices. As such this mutaplasmid could be used to mutate the performance characteristics of most energy nosferatu modules in the correct size class.

Triglavian bioadaptive technology makes extensive use of engineered colonies of extremophilic bacteria, that are used to grow, harvest and adapt various resources found in Abyssal Deadspace. Artificial colonizing plasmids integrated into specialist tools used for direct adaptation of technology can be found in Triglavian caches in various stages of development. These mutaplasmids can be used to alter the characteristics of a wide variety of equipment types, depending on the strain and the bioadaptive tool with which they are integrated.

The mutaplasmid colony integrated into this bioadaptive tool is highly unstable, with a high rate of reproduction and mutation. The mutational benefits of using this mutaplasmid are potentially very high but the risks are also extreme.
Jita Price
164.10m ISK
90d Avg
122.54m ISK
Volume
1
Base Price
1.0k ISK
Jita Market (90d)
Latest Price (2026-04-19)
164.10m ISK
90d Average
122.54m ISK
90d High
222.10m ISK
90d Low
76.20m ISK
Avg Daily Volume
3
Properties
Type ID85522
Group ID1964
Category ID17
Mass1 kg
Volume1 m³
Portion Size1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-04-19164.10m2
2026-04-17163.50m6
2026-04-1490.46m1
2026-04-09164.15m2
2026-04-0590.18m1
2026-04-03134.90m3
2026-04-0190.13m1
2026-03-3090.16m2
2026-03-22170.27m13
2026-03-21121.00m1
2026-03-19112.76m9
2026-03-16107.63m3
2026-03-1585.94m3
2026-03-1497.94m2
2026-03-0685.27m1
2026-03-03195.00m1
2026-03-01145.75m4
2026-02-25222.10m1
2026-02-23222.05m2
2026-02-21205.33m3
2026-02-18150.00m1
2026-02-17119.96m5
2026-02-1477.17m1
2026-02-1291.41m5
2026-02-1077.17m1
2026-02-0577.16m1
2026-02-0377.00m2
2026-02-0176.33m1
2026-01-3196.33m7
2026-01-27121.33m3