Glorified Unstable Medium Energy Nosferatu Mutaplasmid

Glorified Unstable Medium Energy Nosferatu Mutaplasmid

AbyssalMedium Engineering Mutaplasmids

Glorified Unstable Medium Energy Nosferatu Mutaplasmid — Abyssal Mutaplasmids (Commodity) — EVE Online item

Market/Ship and Module Modifications/Mutaplasmids/Engineering Mutaplasmids/Glorified Unstable Medium Energy Nosferatu Mutaplasmid
This bioadaptive mutaplasmid tool is designed to interface with and alter energy charge leeching devices. As such this mutaplasmid could be used to mutate the performance characteristics of most energy nosferatu modules in the correct size class.

Triglavian bioadaptive technology makes extensive use of engineered colonies of extremophilic bacteria, that are used to grow, harvest and adapt various resources found in Abyssal Deadspace. Artificial colonizing plasmids integrated into specialist tools used for direct adaptation of technology can be found in Triglavian caches in various stages of development. These mutaplasmids can be used to alter the characteristics of a wide variety of equipment types, depending on the strain and the bioadaptive tool with which they are integrated.

The mutaplasmid colony integrated into this bioadaptive tool is highly unstable, with a high rate of reproduction and mutation. The mutational benefits of using this mutaplasmid are potentially very high but the risks are also extreme.
Jita Price
154.86m ISK
90d Avg
125.70m ISK
Volume
1
Base Price
1.0k ISK
Jita Market (90d)
Latest Price (2026-06-08)
154.86m ISK
90d Average
125.70m ISK
90d High
299.00m ISK
90d Low
201.1k ISK
Avg Daily Volume
3
Properties
Type ID85512
Group ID1964
Category ID17
Mass1 kg
Volume1 m³
Portion Size1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-06-08154.86m6
2026-06-07113.20m1
2026-06-05129.85m2
2026-06-03113.40m1
2026-06-02113.50m1
2026-06-01155.60m13
2026-05-31115.40m1
2026-05-30115.30m1
2026-05-27169.80m1
2026-05-25115.00m1
2026-05-24113.20m1
2026-05-20201.1k1
2026-05-19110.70m1
2026-05-17237.93m4
2026-05-10262.19m14
2026-05-09131.64m2
2026-05-0898.33m1
2026-05-0398.17m2
2026-05-0298.15m1
2026-04-2998.00m2
2026-04-27200.00m1
2026-04-26193.95m2
2026-04-22180.54m8
2026-04-1397.44m1
2026-04-1297.45m1
2026-04-11153.50m4
2026-04-1097.41m3
2026-04-08129.07m4
2026-04-07115.80m4
2026-04-06129.70m2