Glorified Gravid 100MN Afterburner Mutaplasmid

Glorified Gravid 100MN Afterburner Mutaplasmid

AbyssalLarge Astronautic Mutaplasmids

Glorified Gravid 100MN Afterburner Mutaplasmid — Abyssal Mutaplasmids (Commodity) — EVE Online item

Market/Ship and Module Modifications/Mutaplasmids/Mutaplasmids/Glorified Gravid 100MN Afterburner Mutaplasmid
This bioadaptive mutaplasmid tool is designed to interface with and alter propulsion systems relying on impulse thrust principles alone. As such this mutaplasmid could be used to mutate the performance characteristics of most afterburners in the correct size class.

Triglavian bioadaptive technology makes extensive use of engineered colonies of extremophilic bacteria, that are used to grow, harvest and adapt various resources found in Abyssal Deadspace. Artificial colonizing plasmids integrated into specialist tools used for direct adaptation of technology can be found in Triglavian caches in various stages of development. These mutaplasmids can be used to alter the characteristics of a wide variety of equipment types, depending on the strain and the bioadaptive tool with which they are integrated.

The mutaplasmid colony integrated into this bioadaptive tool appears to be mature and reproducing at a healthy rate. The mutational benefits and risks of using this mutaplasmid are within relatively balanced bounds.
Jita Price
69.10m ISK
90d Avg
83.79m ISK
Volume
1
Base Price
1.0k ISK
Jita Market (90d)
Latest Price (2026-08-30)
69.10m ISK
90d Average
83.79m ISK
90d High
138.90m ISK
90d Low
57.32m ISK
Avg Daily Volume
4
Properties
Type ID85476
Category ID17
Mass1 kg
Volume1 m³
Packaged Volume1 m³
Portion Size1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-08-3069.10m3
2026-08-2969.04m2
2026-08-2766.65m20
2026-08-2660.73m7
2026-08-2368.69m5
2026-08-2268.69m1
2026-08-2168.53m4
2026-08-1868.73m2
2026-08-1763.06m4
2026-08-1661.93m5
2026-08-1563.14m4
2026-08-1468.01m14
2026-08-1358.12m1
2026-08-1268.77m1
2026-08-1165.22m3
2026-08-0968.78m2
2026-08-0866.98m6
2026-08-0758.11m1
2026-08-0558.45m2
2026-08-0458.62m2
2026-08-0264.72m6
2026-08-0169.50m1
2026-07-3169.68m5
2026-07-2968.97m5
2026-07-2765.95m3
2026-07-2566.59m3
2026-07-2477.86m2
2026-07-2277.88m3
2026-07-2177.70m5
2026-07-1777.87m2