Glorified Decayed 5MN Microwarpdrive Mutaplasmid

Glorified Decayed 5MN Microwarpdrive Mutaplasmid

AbyssalSmall Astronautic Mutaplasmids

Glorified Decayed 5MN Microwarpdrive Mutaplasmid — Abyssal Mutaplasmids (Commodity) — EVE Online item

Market/Ship and Module Modifications/Mutaplasmids/Mutaplasmids/Glorified Decayed 5MN Microwarpdrive Mutaplasmid
This bioadaptive mutaplasmid tool is designed to interface with and alter propulsion systems that combine impulse thrust with localized warp field transformations. As such this mutaplasmid could be used to mutate the performance characteristics of most microwarpdrives in the correct size class.

Triglavian bioadaptive technology makes extensive use of engineered colonies of extremophilic bacteria, that are used to grow, harvest and adapt various resources found in Abyssal Deadspace. Artificial colonizing plasmids integrated into specialist tools used for direct adaptation of technology can be found in Triglavian caches in various stages of development. These mutaplasmids can be used to alter the characteristics of a wide variety of equipment types, depending on the strain and the bioadaptive tool with which they are integrated.

The mutaplasmid colony integrated into this bioadaptive tool has begun to decay and mutation effects will be less pronounced as a result. While possible mutational benefits are low, the risks of using this mutaplasmid are also reduced.
Jita Price
6.80m ISK
90d Avg
6.60m ISK
Volume
1
Base Price
1.0k ISK
Jita Market (90d)
Latest Price (2026-08-30)
6.80m ISK
90d Average
6.60m ISK
90d High
15.40m ISK
90d Low
2.67m ISK
Avg Daily Volume
5
Properties
Type ID85468
Category ID17
Mass1 kg
Volume1 m³
Packaged Volume1 m³
Portion Size1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-08-306.80m10
2026-08-296.70m2
2026-08-266.53m6
2026-08-253.87m2
2026-08-246.50m1
2026-08-235.34m2
2026-08-213.87m2
2026-08-203.87m4
2026-08-195.47m11
2026-08-173.88m13
2026-08-163.87m1
2026-08-153.87m2
2026-08-134.41m3
2026-08-113.86m2
2026-08-088.00m2
2026-08-033.85m3
2026-08-023.85m1
2026-08-018.50m1
2026-07-298.21m1
2026-07-2413.60m1
2026-07-218.82m2
2026-07-1914.32m4
2026-07-173.82m1
2026-07-153.82m1
2026-07-1411.86m11
2026-07-0810.88m18
2026-07-053.81m4
2026-07-048.98m2
2026-06-293.80m1
2026-06-287.13m2