Men's Radioactives Reclamation Goggles
EyewearMen's Radioactives Reclamation Goggles — Eyewear (Apparel) — EVE Online item
Extraction and processing of radioactive materials for use in industry can be difficult and hazardous work at best, with many standard mining techniques often treating such materials as waste byproducts that are better disposed of in space. Always on the look out for ways to increase the profitability of their mining and materials harvesting operations, ORE has established a specialist Radioactives Reclamation unit, equipped with dedicated harvesting and transport ships, to exploit dangerous and difficult to work radioactive materials.
Radioactives Reclamation Specialists are easily recognised by the vivid "radioactive green" highlighting on the otherwise standard blue and grey of their protective goggles. The goggles are designed to protect the eyes against various forms of radiation but, like the suits the specialists wear, also incorporate a repulsion field shielding the head from any radiation, particles or loose dust given off by the materials the wearer may be handling in the course of their work.
Radioactives Reclamation Specialists are easily recognised by the vivid "radioactive green" highlighting on the otherwise standard blue and grey of their protective goggles. The goggles are designed to protect the eyes against various forms of radiation but, like the suits the specialists wear, also incorporate a repulsion field shielding the head from any radiation, particles or loose dust given off by the materials the wearer may be handling in the course of their work.
Jita Price
341.8k ISK
90d Avg
4.60m ISK
Volume
0.1 m³
Jita Market (90d)
Latest Price (2026-05-29)
341.8k ISK
90d Average
4.60m ISK
90d High
87.96m ISK
90d Low
93.5k ISK
Avg Daily Volume
7
Properties
Type ID60639
Group ID1083
Category ID30
Mass0.5 kg
Volume0.1 m³
Portion Size1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-05-29341.8k1
2026-05-28341.6k2
2026-05-27341.4k3
2026-05-253.31m19
2026-05-24341.0k2
2026-05-22318.8k7
2026-05-213.45m2
2026-05-202.32m3
2026-05-18318.6k2
2026-05-173.91m2
2026-05-16316.7k5
2026-05-15316.8k4
2026-05-137.30m1
2026-05-127.32m1
2026-05-11316.1k4
2026-05-107.80m1
2026-05-092.10m5
2026-05-084.14m2
2026-05-072.87m3
2026-05-06315.9k1
2026-05-057.53m4
2026-05-04315.4k1
2026-05-03315.2k3
2026-05-02315.5k18
2026-04-29315.1k3
2026-04-27314.1k1
2026-04-261.19m11
2026-04-251.51m2
2026-04-2487.95m2
2026-04-234.88m4