Mercoxit Asteroid Mining Crystal Type C II
Tech IIMercoxit Asteroid Mining CrystalsMercoxit Asteroid Mining Crystal Type C II — Tech II Mercoxit Mining Crystal (Charge) — EVE Online item
Market/Ammunition & Charges/Mining Crystals/Mercoxit Mining Crystal/Mercoxit Asteroid Mining Crystal Type C II
An advanced custom-cut frequency crystal whose refractive qualities are specifically suited to boosting Mercoxit yield.
Due to their molecular make-up and the strength of the modulated miner's beam, these crystals will deteriorate through extended use. Can be loaded into modulated mining lasers only.
Type C crystals are used with modulated mining equipment and provide low yields, with very high residues and very low reliability. Typically used for asteroid field clearance purposes only.
Due to their molecular make-up and the strength of the modulated miner's beam, these crystals will deteriorate through extended use. Can be loaded into modulated mining lasers only.
Type C crystals are used with modulated mining equipment and provide low yields, with very high residues and very low reliability. Typically used for asteroid field clearance purposes only.
Jita Price
1.48m ISK
90d Avg
3.30m ISK
Volume
10 m³
Base Price
5.04m ISK
Jita Market (90d)
Latest Price (2026-10-10)
1.48m ISK
90d Average
3.30m ISK
90d High
4.29m ISK
90d Low
1.45m ISK
Avg Daily Volume
11
Variations(6)
Recent Destructions
View all →Hulk· Raven Greyhawk Kloss · UNAG-6
245.45mHulk· Alamon S · Niarja
354.95mHulk· Alamon K · Niarja
353.59mHulk· Alamon U · Niarja
349.19mHulk· Bai-JBB · Niarja
381.80mHulk· Alamon S · Niarja
349.02mHulk· Bai-JCC · Niarja
391.67mHulk· Alamon Tsukaya · Niarja
349.73mMackinaw· A Gayest Fish · Niarja
463.17mMackinaw· A Gay Fish · Niarja
466.20mRequired Skills
Attributes
Structure HP1
Charge Size1
Reprocessing Materials
Properties
Type ID60312
Category ID8
Mass1 kg
Volume10 m³
Packaged Volume10 m³
Portion Size1
Meta Level5
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-10-101.48m23
2026-10-083.25m24
2026-10-073.28m20
2026-09-303.43m34
2026-09-283.44m4
2026-09-271.47m4
2026-09-251.47m2
2026-09-203.50m2
2026-09-163.66m6
2026-09-111.45m4
2026-09-071.45m2
2026-09-063.77m5
2026-08-284.14m1
2026-08-224.28m4
2026-08-204.12m44
2026-08-144.04m24
2026-08-083.92m4
2026-08-013.90m6
2026-07-284.10m6
2026-07-274.13m18
2026-07-194.22m2
2026-07-184.22m8