Strong Veilguard Booster
Booster Slot 14Strong Veilguard Booster — Booster (Implant) — EVE Online item
The product of extensive research by the SOE's research organization, the Sanctuary, this booster increases the stabilized cloak duration for any cloaks used by the capsuleer.
Using a novel cocktail of neural pharmaceuticals in carefully designed proportions, the scientists of the Sanctuary have developed the Veilguard booster. This potent formula enhances the ability of a capsuleer to sustainably handle the complex quantum fluctuation calculations necessary to maintain a stable cloaking field. The SOE use this booster for their exploration and covert rescue missions but also make it available to friendly capsuleers.
The effect of this booster is so powerful that the stabilization can be maintained for up to three times the normal sustainable period.
Using a novel cocktail of neural pharmaceuticals in carefully designed proportions, the scientists of the Sanctuary have developed the Veilguard booster. This potent formula enhances the ability of a capsuleer to sustainably handle the complex quantum fluctuation calculations necessary to maintain a stable cloaking field. The SOE use this booster for their exploration and covert rescue missions but also make it available to friendly capsuleers.
The effect of this booster is so powerful that the stabilization can be maintained for up to three times the normal sustainable period.
Jita Price
64.98m ISK
90d Avg
67.53m ISK
Volume
1 m³
Base Price
532.8k ISK
Jita Market (90d)
Latest Price (2026-10-01)
64.98m ISK
90d Average
67.53m ISK
90d High
89.10m ISK
90d Low
30.72m ISK
Avg Daily Volume
9
Reprocessing Materials
Properties
Type ID59633
GroupBooster (303)
Category ID20
Mass1 kg
Volume1 m³
Packaged Volume1 m³
Portion Size1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-10-0164.98m3
2026-09-3064.99m2
2026-09-2863.33m3
2026-09-2761.64m12
2026-09-2664.98m5
2026-09-2564.86m6
2026-09-2456.59m21
2026-09-2363.01m15
2026-09-2165.72m1
2026-09-2056.01m7
2026-09-1965.86m2
2026-09-1865.99m6
2026-09-1766.43m3
2026-09-1666.66m2
2026-09-1539.81m8
2026-09-1445.12m28
2026-09-1369.95m6
2026-09-1259.06m63
2026-09-1064.00m1
2026-09-0963.42m7
2026-09-0863.99m2
2026-09-0763.98m7
2026-09-0552.93m7
2026-09-0456.18m5
2026-09-0344.37m9
2026-09-0253.20m20
2026-08-3164.26m3
2026-08-3059.37m3
2026-08-2965.09m12
2026-08-2757.27m1