Strong Veilguard Booster
Booster Slot 14Strong Veilguard Booster — Booster (Implant) — EVE Online item
The product of extensive research by the SOE's research organization, the Sanctuary, this booster increases the stabilized cloak duration for any cloaks used by the capsuleer.
Using a novel cocktail of neural pharmaceuticals in carefully designed proportions, the scientists of the Sanctuary have developed the Veilguard booster. This potent formula enhances the ability of a capsuleer to sustainably handle the complex quantum fluctuation calculations necessary to maintain a stable cloaking field. The SOE use this booster for their exploration and covert rescue missions but also make it available to friendly capsuleers.
The effect of this booster is so powerful that the stabilization can be maintained for up to three times the normal sustainable period.
Using a novel cocktail of neural pharmaceuticals in carefully designed proportions, the scientists of the Sanctuary have developed the Veilguard booster. This potent formula enhances the ability of a capsuleer to sustainably handle the complex quantum fluctuation calculations necessary to maintain a stable cloaking field. The SOE use this booster for their exploration and covert rescue missions but also make it available to friendly capsuleers.
The effect of this booster is so powerful that the stabilization can be maintained for up to three times the normal sustainable period.
Jita Price
59.92m ISK
90d Avg
51.09m ISK
Volume
1 m³
Base Price
532.8k ISK
Jita Market (90d)
Latest Price (2026-07-03)
59.92m ISK
90d Average
51.09m ISK
90d High
120.00m ISK
90d Low
26.30m ISK
Avg Daily Volume
11
Reprocessing Materials
Properties
Type ID59633
Group ID303
Category ID20
Mass1 kg
Volume1 m³
Portion Size1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-07-0359.92m4
2026-07-0260.00m10
2026-07-0151.01m16
2026-06-3042.04m20
2026-06-2940.18m32
2026-06-2842.16m13
2026-06-2642.19m4
2026-06-2442.22m5
2026-06-2342.23m11
2026-06-2240.64m33
2026-06-2042.19m1
2026-06-1842.25m5
2026-06-1742.26m7
2026-06-1642.25m1
2026-06-1439.53m16
2026-06-1338.60m6
2026-06-1041.63m11
2026-06-0942.29m5
2026-06-0842.27m2
2026-06-0742.20m3
2026-06-0643.07m19
2026-06-0543.28m6
2026-06-0343.37m3
2026-06-0243.37m4
2026-06-0143.39m2
2026-05-3143.40m10
2026-05-2939.28m5
2026-05-2839.76m8
2026-05-2743.57m12
2026-05-2628.60m2