High-grade Mimesis Alpha

High-grade Mimesis Alpha

FactionImplant Slot 01

High-grade Mimesis Alpha — Faction Cyberimplant (Implant) — EVE Online item

This ocular filter is listed in the DED inventory as a modification by CONCORD weapons technologists of standard capsuleer implant templates with control routines that mimic methods of enhancing the firepower of reverse-engineered Triglavian weaponry, at the cost of a slower build up to maximum particle stream output.

However, persistent rumors among New Eden's capsuleer, transhuman and wirehead communities suggest that the research and development group that created these implants was lead by a Society of Conscious Thought team with special expertise in so-called "restricted artificial intelligences". The possibility that these implants are based on RAI technology raises startling questions about the nature of the "mimesis" involved in these augmentations.

Primary Effect: +4 bonus to Perception

Secondary Effect: 1.5% bonus to maximum damage output of entropic disintegrators

Tertiary Effect: 0.33% penalty to damage multiplier increase per cycle of entropic disintegrators

Set Effect: 20% bonus to the strength of all Mimesis implant secondary effects
Jita Price
124.00m ISK
90d Avg
118.80m ISK
Volume
1 m³
Base Price
800.0k ISK
Jita Market (90d)
Latest Price (2026-10-11)
124.00m ISK
90d Average
118.80m ISK
90d High
130.00m ISK
90d Low
76.99m ISK
Avg Daily Volume
2
Required Skills
Properties
Type ID52917
Category ID20
Volume1 m³
Packaged Volume1 m³
Portion Size1
Meta Level9
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-10-11124.00m2
2026-10-10113.94m7
2026-10-07108.80m4
2026-10-06120.40m5
2026-10-05120.40m1
2026-10-03120.30m2
2026-10-02120.30m1
2026-10-01120.40m3
2026-09-30120.40m2
2026-09-27120.40m1
2026-09-25120.80m3
2026-09-24120.75m2
2026-09-23120.90m2
2026-09-22120.90m1
2026-09-20120.90m1
2026-09-19120.90m1
2026-09-18120.85m2
2026-09-16120.45m4
2026-09-15118.75m6
2026-09-14100.13m3
2026-09-13115.83m3
2026-09-12109.87m7
2026-09-11109.80m1
2026-09-09109.80m1
2026-09-08109.00m1
2026-09-05118.80m1
2026-08-30120.00m1
2026-08-29120.00m1
2026-08-27120.00m2
2026-08-24121.00m1