Mid-grade Mimesis Gamma

Mid-grade Mimesis Gamma

FactionImplant Slot 03

Mid-grade Mimesis Gamma — Faction Cyberimplant (Implant) — EVE Online item

This neural boost is listed in the DED inventory as a modification by CONCORD weapons technologists of standard capsuleer implant templates with control routines that mimic methods of enhancing the firepower of reverse-engineered Triglavian weaponry, at the cost of a slower build up to maximum particle stream output.

However, persistent rumors among New Eden's capsuleer, transhuman and wirehead communities suggest that the research and development group that created these implants was lead by a Society of Conscious Thought team with special expertise in so-called "restricted artificial intelligences". The possibility that these implants are based on RAI technology raises startling questions about the nature of the "mimesis" involved in these augmentations.

Primary Effect: +3 bonus to Willpower

Secondary Effect: 2.25% bonus to maximum damage output of entropic disintegrators

Tertiary Effect: 0.33% penalty to damage multiplier increase per cycle of entropic disintegrators

Set Effect: 20% bonus to the strength of all Mimesis implant secondary effects
Jita Price
104.65m ISK
90d Avg
114.82m ISK
Volume
1
Jita Market (90d)
Latest Price (2026-05-23)
104.65m ISK
90d Average
114.82m ISK
90d High
345.40m ISK
90d Low
77.58m ISK
Avg Daily Volume
2
Required Skills
Properties
Type ID52787
Group ID300
Category ID20
Volume1 m³
Portion Size1
Meta Level9
Tech Level2
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-05-23104.65m2
2026-05-22104.60m1
2026-05-20104.60m1
2026-05-1979.31m4
2026-05-17104.50m1
2026-05-14104.08m5
2026-05-13104.90m1
2026-05-12104.80m2
2026-05-0879.26m1
2026-05-07104.80m1
2026-05-06104.80m1
2026-05-05105.00m1
2026-05-04104.00m1
2026-05-03103.00m2
2026-05-02104.00m1
2026-04-28107.90m1
2026-04-26109.93m3
2026-04-22110.00m1
2026-04-2079.00m2
2026-04-19110.00m1
2026-04-17112.00m1
2026-04-12113.90m1
2026-04-10113.90m3
2026-04-07114.00m2
2026-04-05114.90m2
2026-04-03115.00m1
2026-03-31117.90m1
2026-03-28117.88m4
2026-03-27115.47m4
2026-03-26117.90m2