Heavy Mutadaptive Remote Armor Repairer I
Tech IMediumHeavy Mutadaptive Remote Armor Repairer I — Tech I Mutadaptive Remote Armor Repairer (Module) — EVE Online item
Market/Ship Equipment/Hull & Armor/Mutadaptive Remote Armor Repairers/Heavy Mutadaptive Remote Armor Repairer I
Triglavian remote armor repair equipment use mutadaptive technology to restore lost material with escalating effect over time. This is achieved using specialized armor repair mutaplasmids as nanite feedstock for the remote repair projectors.
As the armor repair mutaplasmid stream is able to adapt itself in real-time to specific target ship conditions far more efficiently than standard armor repair nanites, the efficiency of armor repairing performed by the nanite stream on a given target increases over time towards a maximal repair output.
As the armor repair mutaplasmid stream is able to adapt itself in real-time to specific target ship conditions far more efficiently than standard armor repair nanites, the efficiency of armor repairing performed by the nanite stream on a given target increases over time towards a maximal repair output.
Jita Price
10.01m ISK
90d Avg
11.52m ISK
Volume
10 m³
Base Price
12.5k ISK
Jita Market (90d)
Latest Price (2026-05-23)
10.01m ISK
90d Average
11.52m ISK
90d High
17.00m ISK
90d Low
5.75m ISK
Avg Daily Volume
10
Variations(5)
Recent Destructions
View all →Rodiva· Tyldek Taredi · LBGI-2
99.01mRodiva· Logr · J144636
88.60mRodiva· danny lowbiter · Ravarin
119.99mRodiva· Carbonnarross · ZQ-Z3Y
124.42mRodiva· PRIMAR2 Estemaire · Gare
130.74mRodiva· CNXUJIE · Decon
85.87mZarmazd· Pikuli · 5T-A3D
918.71mZarmazd· Pikuli Avada · 5T-A3D
914.55mRodiva· Jiraan · Z-ENUD
147.75mRodiva· Kala Driuz · Mod
90.05mRequired Skills
Attributes
Activation Cost465.0 GJ
Structure HP40
Powergrid Usage360 MW
CPU Usage60 tf
Cycle Time6.0s
Reprocessing Materials
Properties
Type ID49770
Group ID2018
Category ID7
Mass20 kg
Volume10 m³
Portion Size1
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-05-2310.01m1
2026-05-2216.41m1
2026-05-1916.44m1
2026-05-1716.50m50
2026-05-1410.00m1
2026-05-139.75m1
2026-05-1210.00m1
2026-05-109.50m1
2026-05-0916.00m5
2026-05-079.25m1
2026-05-0614.00m2
2026-05-0513.31m13
2026-05-039.00m1
2026-04-299.01m1
2026-04-2716.38m22
2026-04-2414.80m26
2026-04-2314.93m4
2026-04-198.09m1
2026-04-1814.97m7
2026-04-1214.97m12
2026-04-118.02m1
2026-04-0911.98m8
2026-04-089.00m1
2026-04-0711.46m19
2026-04-057.00m2
2026-03-3011.00m2
2026-03-2215.00m1
2026-03-1914.33m9
2026-03-1811.34m12
2026-03-1610.09m14