Light Compact Entropic Disintegrator

Light Compact Entropic Disintegrator

Tech ISmall

Light Compact Entropic Disintegrator — Tech I Precursor Weapon (Module) — EVE Online item

This small Entropic Disintegrator is typically seen in use on Triglavian frigates and destroyers, which are able to handle the relatively minimal radiation and gravitational tidal forces the weapon generates as a side-effect of its operation.

Entropic Disintegrators draw on the tremendous power of the Triglavian singularity-based energy systems to convert exotic matter into a particle stream directed with locally generated entropic force. While powerful, the range of the weapon is limited by the attenuation of entropic forces, which dissipate critically beyond the optimal range. As a result this weapon has no falloff range.

The particle stream generates thermal and explosive reactions on impact, and the entropic forces resolve into a localized gravitational conduit that steadily increases the acceleration on the exotic particles. In effect, the weapon's damage potential increases to a maximum level as long as the particle stream is kept on the same target.

Requires exotic plasma charge ammo types: Baryon, Meson, and Tetryon.
Jita Price
19.72m ISK
90d Avg
16.07m ISK
Volume
5
Jita Market (90d)
Latest Price (2026-07-12)
19.72m ISK
90d Average
16.07m ISK
90d High
30.00m ISK
90d Low
1.00m ISK
Avg Daily Volume
6
Attributes
Activation Cost5.2 GJ
Structure HP40
Powergrid Usage27 MW
CPU Usage39 tf
Charge Size1
Charge Group1,987
Properties
Type ID47912
Group ID1986
Category ID7
Mass500 kg
Volume5 m³
Capacity5 m³
Portion Size1
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-07-1219.72m1
2026-07-1114.45m6
2026-07-1018.51m6
2026-07-0817.18m3
2026-07-0715.80m2
2026-07-0512.51m12
2026-07-0416.83m4
2026-07-0315.04m6
2026-07-0121.99m3
2026-06-3018.80m22
2026-06-2811.13m2
2026-06-2714.63m3
2026-06-2621.95m7
2026-06-2510.53m2
2026-06-2419.23m8
2026-06-2310.49m1
2026-06-2218.83m19
2026-06-2110.47m2
2026-06-2016.76m10
2026-06-1914.61m5
2026-06-1813.05m10
2026-06-1714.01m4
2026-06-1620.73m6
2026-06-1510.25m1
2026-06-1420.47m40
2026-06-1314.97m3
2026-06-1217.43m4
2026-06-1117.19m12
2026-06-106.41m2
2026-06-0917.35m19