Standup M-Set Moon Ore Grading Processor II

Standup M-Set Moon Ore Grading Processor II

Structure Tech IIMedium Structure Resource Processing Rigs

Standup M-Set Moon Ore Grading Processor II — Structure Tech II Structure Resource Rig M - Moon Ore Reprocessing (Structure Module) — EVE Online item

Market/Structure Modifications/Structure Resource Processing Rigs/Standup M-Set Moon Ore Grading Processor II
The Standup M-Set Moon Ore Grading Processor II rig provides a means for structure operators to adjust hardware systems involved in reprocessing moon ore so as to significantly increase refinery efficiency on Upwell technology structures. This rig improves the refining yield of all Ubiquitous, Common, Uncommon, Rare, and Exceptional Moon Asteroid variants.

Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.

Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Jita Price
1.47b ISK
90d Avg
1.29b ISK
Volume
10
Jita Market (90d)
Latest Price (2026-08-21)
1.47b ISK
90d Average
1.29b ISK
90d High
1.49b ISK
90d Low
1.02b ISK
Avg Daily Volume
2
Variations(2)
Standup M-Set Moon Ore Grading Processor II
Standup M-Set Moon Ore Grading Processor II
Structure Tech II
Standup M-Set Moon Ore Grading Processor I
Standup M-Set Moon Ore Grading Processor I
Structure Tech I
Recent Prices (Jita)
DatePriceVolume
2026-08-211.47b1
2026-08-181.48b2
2026-08-161.43b1
2026-08-151.41b3
2026-08-121.36b3
2026-08-111.35b1
2026-08-091.36b1
2026-08-071.21b2
2026-08-041.35b2
2026-08-031.06b1
2026-08-021.35b1
2026-08-011.16b2
2026-07-251.25b1
2026-07-221.23b1
2026-07-151.36b1
2026-07-131.26b4
2026-07-121.35b1
2026-07-091.13b2
2026-07-071.29b1
2026-07-041.19b2
2026-06-261.17b1
2026-06-251.20b1
2026-06-241.14b2
2026-06-231.25b1
2026-06-221.25b1
2026-06-141.34b1
2026-06-121.32b1
2026-06-091.40b1
2026-06-071.27b3
2026-06-011.23b2