Standup M-Set Hybrid Reactor Material Efficiency I

Standup M-Set Hybrid Reactor Material Efficiency I

Structure Tech IMedium Structure Resource Processing Rigs

Standup M-Set Hybrid Reactor Material Efficiency I — Structure Tech I Structure Hybrid Reactor Rig M - ME (Structure Module) — EVE Online item

Market/Structure Modifications/Structure Resource Processing Rigs/Standup M-Set Hybrid Reactor Material Efficiency I
The Standup M-Set Hybrid Reactor Material Efficiency I rig provides a means for structure operators to decrease material requirements for Tech 3 hybrid reactions in their Upwell Refinery structures.

Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.

Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Jita Price
427.48m ISK
90d Avg
373.87m ISK
Volume
10
Jita Market (90d)
Latest Price (2026-08-18)
427.48m ISK
90d Average
373.87m ISK
90d High
517.00m ISK
90d Low
274.00m ISK
Avg Daily Volume
1
Variations(2)
Standup M-Set Hybrid Reactor Material Efficiency II
Standup M-Set Hybrid Reactor Material Efficiency II
Structure Tech II
Standup M-Set Hybrid Reactor Material Efficiency I
Standup M-Set Hybrid Reactor Material Efficiency I
Structure Tech I
Recent Prices (Jita)
DatePriceVolume
2026-08-18427.48m4
2026-08-16517.00m1
2026-08-15353.87m3
2026-08-14350.80m1
2026-08-13350.50m2
2026-08-12351.80m1
2026-08-10350.90m2
2026-08-07355.00m1
2026-08-04355.00m1
2026-07-24395.00m1
2026-07-22380.00m1
2026-07-14409.30m3
2026-07-13364.00m1
2026-07-07364.00m2
2026-07-05360.00m1
2026-07-03362.50m2
2026-07-02359.95m2
2026-06-30274.00m1
2026-06-29360.00m2
2026-06-26365.00m1
2026-06-25365.00m2
2026-06-24385.00m1
2026-06-19444.90m1
2026-06-17445.00m1
2026-06-08392.00m1
2026-06-07391.90m1
2026-06-06374.85m2
2026-06-04391.00m1
2026-05-31358.00m2
2026-05-30340.00m1