Standup M-Set Composite Reactor Material Efficiency I

Standup M-Set Composite Reactor Material Efficiency I

Structure Tech IMedium Structure Resource Processing Rigs

Standup M-Set Composite Reactor Material Efficiency I — Structure Tech I Structure Composite Reactor Rig M - ME (Structure Module) — EVE Online item

Market/Structure Modifications/Structure Resource Processing Rigs/Standup M-Set Composite Reactor Material Efficiency I
The Standup M-Set Composite Reactor Material Efficiency I rig provides a means for structure operators to decrease material requirements for Tech 2 composite reactions in their Upwell Refinery structures.

Standup is a proprietary system that uses a Structure Autonomous Nanoassembly Device (Upwell) containing integrated template software, a nanoassembler array and sufficient nanomass to enable the construction of a variety of service modules, structure modules and structure rigs when inserted into the appropriate slots on a structure built with Upwell technology.

Note: Only one rig of the same type, counting both tech variations, may be fitted at the same time on a structure.
Jita Price
387.00m ISK
90d Avg
378.79m ISK
Volume
10
Jita Market (90d)
Latest Price (2026-05-27)
387.00m ISK
90d Average
378.79m ISK
90d High
450.00m ISK
90d Low
297.90m ISK
Avg Daily Volume
2
Variations(2)
Standup M-Set Composite Reactor Material Efficiency II
Standup M-Set Composite Reactor Material Efficiency II
Structure Tech II
Standup M-Set Composite Reactor Material Efficiency I
Standup M-Set Composite Reactor Material Efficiency I
Structure Tech I
Required Skills
Attributes
Structure HP40
Calibration Cost100
Properties
Type ID46486
Group ID1934
Category ID66
Mass200 kg
Volume10 m³
Portion Size1
Radius100 m
Tech Level1
PublishedYes
Recent Prices (Jita)
DatePriceVolume
2026-05-27387.00m1
2026-05-26387.00m1
2026-05-25359.90m1
2026-05-24359.00m2
2026-05-22359.00m1
2026-05-21354.47m3
2026-05-18369.90m1
2026-05-17365.00m2
2026-05-15363.00m1
2026-05-13370.00m1
2026-05-12375.00m1
2026-05-10379.30m3
2026-05-09360.00m1
2026-05-08343.67m3
2026-05-07369.00m1
2026-05-05334.90m1
2026-05-03364.90m1
2026-05-02297.90m2
2026-04-30377.45m2
2026-04-27380.00m1
2026-04-25390.00m2
2026-04-24387.00m2
2026-04-21410.00m1
2026-04-19378.93m3
2026-04-18338.55m2
2026-04-09380.00m1
2026-04-06362.00m1
2026-04-02374.00m1
2026-03-31379.00m1
2026-03-30395.00m1